Brian Green News

First Subsea Wins Technip Connector contract

First Subsea Awarded Lucius Spar Mooring Connector Contract. Deepwater mooring specialist, First Subsea Ltd has been awarded a contract by Technip USA Inc to supply the mooring line connectors for a new spar platform moored in 7,000ft (2,134 m) of water in the Lucius field, Keathley Canyon block 875 in the Gulf of Mexico. The Lucius spar will be moored by nine Ballgrab ball and taper mooring connectors attached to polyester mooring lines. The Ballgrab connector comprises a male connector and female receptacle. The Series III male connectors will comply with the new ABS Mooring Guide 2009.

Structural Integrity NDT Test for Deepwater Fiber Rope Connectors

First Subsea is using innovative non-destructive testing (NDT) technology to inspect the quality of forgings used in the new range of LankoFirst fiber rope connectors for deepwater moorings. Process Compensated Resonance Testing (PCRT) undertaken by Vibrant NDT Ltd is reportedly the only NDT technology to correlate to the structural integrity of the inspected component. The LankoFirst fiber rope mooring connector is designed to revolutionize the ease with which deepwater fiber mooring lines for rope-rope, rope-wire and rope-chain connections are deployed offshore.