Container Terminal Of Tenerife News

Zamakona Delivers Ro-Ro Ramp to TCT

This past Wednesday, January 15, Zamakona Yards carried out the load testing and delivery of the movable ramp for the roll on roll off dock built for the Container Terminal of Tenerife (OHL Group). Zamakona  said the elevating structure is the only of its kind in the Canary Islands, permitting a more versatile use of the pier since it will only be employed when vessels with rolling stock arrive (Ro-Ro), permitting the use of the dock for conventional vessels at other times. It consist of an elevating ramp, 25 meters wide by 20 meters long, for vessels docking at this point in Tenerife.