Grete Ernst News

Getting Serious About Titanic ll

Blue Star Line in conjunction with German hydrodynamic service and consulting group the Hamburg Ship Model Basin (HSVA) has conducted the first model testing of the proposed Titanic II in Germany. A 9.3m wooden model of Titanic II was put through propulsion and power testing in a 300m long tank at HSVA’s Hamburg facilities over four days from September 9-12. “The speed and power performance model testing is one of the critical aspects for a prototype vessel and needs to be verified before a construction contract is completed.