Isolated Ballast Systems News

BWTS: Challenges for Installation Engineering

Many of the challenges related to engineering the actual installation of a ballast water treatment system have been noted in the sections describing the treatment technology factors above. These challenges can be especially acute when installing a system on an existing vessel. Finding solutions to treatment system back pressure and potential f low rate reductions, power consumption demands, control system integration and space requirements, as well as access for installation, can be difficult and costly.