Kenc Engineering Bv News

KENC Engineering Snags Key U.S. Offshore Wind Contract

KENC Engineering B.V. received a contract from an undisclosed party to design and build a Hammer Quick Lifting Frame. For hammering operations during the construction of two US offshore wind farms, KENC has the assignment to design and build a Hammer Quick Lifting Frame (HQLF). The HQLF integrates a Balltec quick connect receptacle and a 750mT piling hammer. The scope includes installation aids for easy onsite assembly. The tool will be delivered in Q1 of 2023 and deployed in the summer of 2023.

KENC Expanding Presence in oil & Gas Sector

KENC Oil & Gas, specialists in the design, fabrication and supply of custom engineered equipment, will move to new, larger premises to meet growing demand from the on and offshore industries. From mid-July, KENC’s new headquarters will be at a 450m2 facility nearby the company’s existing address in Oldenzaal, the Netherlands. “This expansion is necessary thanks to the increasing number and size of engineering projects we are completing,” notes company founder Eric Buining. “We design, fabricate and supply increasingly specialized upstream oil and gas equipment. To meet that demand, not only are we expanding our facilities, but KENC’s expert workforce is also growing. Since the company was founded, KENC has shown solid growth.