Large Ground Transportation Area News

Singapore's Second Cruise Terminal Set to Welcome First Ship

The 28,000-square-meter terminal, which was built at a cost of 500 million Singapore dollars (400 million U.S. dollars) and operated by the SATS-Creuers Cruise Services, will effectively double Singapore's berth capacity. The terminal has the capability to dock ships of up to 220,000 gross register tonnage (GRT) and measuring up to 360 meters in length with a hull draft of up to 11.5 meters. It also has a spacious arrival and departure hall comprising 80 check-in counters and up to 40 immigration counters…