Liebherr News
Liebherr to Supply STS Cranes to Port Tampa Bay
Liebherr Container Cranes has signed a contract to deliver two ship-to-shore (STS) cranes to Port Tampa Bay, marking Liebherr’s first STS installation on Florida’s Gulf Coast.The cranes will play a central role in the port’s Vision 2030 expansion and will deliver significant gains in berth productivity, vessel turnaround efficiency, and long-term operational reliability.The new cranes, manufactured at Liebherr’s facility in Killarney, Ireland, feature a 60-metre (197FT) outreach…
Liebherr BOS Cranes Celebrates 50 Years
Liebherr marks half a century of BOS crane excellence. Since 1975, BOS cranes have been trusted by operators worldwide, known for their robust design and marine adaptability. The latest generation continues this legacy, now featuring an electric variant to meet evolving offshore demands.In 1975, Liebherr delivered its first BOS crane, the B10 / 17 EX, for installation on the Floating Production, Storage and Offloading Unit Princess Aweni. Since then, the BOS series has undergone continuous development…
Liebherr Reports Growth in Electric-Powered Mobile Harbor Cranes
Liebherr, a leader in mobile harbor crane technology, has reached over 2,000 mobile harbor cranes produced and approximately 1,600 units in active service across more than 100 countries.Key regions have embraced electrically driven mobile harbor cranes; India leads in adoption, followed closely by Türkiye. In Europe, the Netherlands, France and Poland also demonstrate steady demand for e-drive technology, alongside the United States and the United Kingdom.Between 2019 and 2025, Liebherr recorded an increase of 400% in its electric drive mobile harbor cranes.
Liebherr to Equip dship’s Fleet with Eight Heavy-Lift Cranes
dship Carriers from Hamburg has selected Liebherr’s LS 250 heavy-duty cranes to equip at least four of the ships in its fleet.The LS 250 cranes are designed to comply with the requirements of the St. Lawrence Regulations. These regulations apply to ships navigating the St. Lawrence Seaway and connecting the Great Lakes in Canada with the Atlantic Ocean.Manufactured at Liebherr’s Rostock site at the German Baltic coast, the eight cranes will be delivered to a Chinese shipyard in 2026.
PT Bahtera Bahari Shipyard Purchases Indonesia’s First All-Electric CBG 500 E Crane
PT Bahtera Bahari Shipyard (PT BBS) has purchased Liebherr’s CBG 500 E. Scheduled for delivery in October 2025, the crane will be installed on a barge currently under construction at their Batam facility. The CBG 500 E features a rope luffing mechanism, a 65-ton safe working load in grab operation, and a 43-meter outreach—making it ideal for high-volumecoal handling. Its all-electric drive system, supported by the Licatronic energy recovery system and supercapacitors, ensures reduced emissions and optimized energy use.
Pair of China-Built Offshore Wind Vessels Enter Fleet
Danish logistics specialist deugro and its partners Siemens Gamesa Renewable Energy A/S and Amasus Offshore B.V. are moving full steam ahead with the next generation of purpose-built transport vessels for the offshore wind sector. In a key milestone for offshore project logistics, the Rotra Futura was delivered on March 30, 2025, and just four days later, her sister ship Rotra Horizon was launched from Zhenjiang Shipyards in Jiangsu Province, China. The Rotra Horizon is slated for delivery in July 2025.The delivery and launch represent a significant expansion of the “Rotra concept…
Liebherr Equips Agogo FPSO with Two Offshore Cranes
Crane specialist Liebherr has supplied two offshore cranes to Yinson Production, which will support the operations of Agogo floating production storage and offloading unit (FPSO) at Azule Energy’s field offshore Angola.Two offshore cranes of the type RL 2600 (Ram Luffing 2600) and RL-K 2600 (Ram Luffing knuckle boom 2600) have been sold to Yinson Production, which is in charge of the provision, operation and maintenance of the Agogo FPSO.The cranes, with a maximum lifting capacity of up to 30 tonnes and a maximum boom outreach of over 30 metres each…
NYCEDC Makes Additional $18 Million Investment to Upgrade Port Operations
New York City Economic Development Corporation (NYCEDC) announced the execution of three maritime infrastructure related contracts to upgrade port operations at the Brooklyn Marine Terminal. After decades of disinvestment, NYCEDC is committed to redeveloping the terminal and container port, starting with the removal of four out-of-service cranes across Piers 9A and 10, and the purchase of a new electric Ship to Shore (STS) crane to serve the Red Hook Container Terminal at Pier 10.
California Box Terminal Orders Liebherr STS Cranes
TraPac Oakland, a container terminal operator in California, has selected Liebherr for the supply of two ship-to-shore (STS) cranes, marking the company’s first shipment to United States’ West Coast.The cranes boast a 66-meter (216-foot) outreach, a 53-meter (173.83-foot) lift height, and a span of 30.48 meters (100 feet).With a lifting capacity of 66 long tonnes in twin-lift mode, they have been designed for high-capacity handling, making them suitable for servicing the world’s…
Offshore Wind RoRo Vessel Rotra Futura Launched
A key consideration in planning for the future of offshore wind is designing and delivering the maritime assets that are 'future-proof', able to scale with the growing size of offshore wind pieces and components.A collaboration between Concordia Damen, Amasus, deugro Danmark, Siemens Gamesa, and DEKC Maritime aims to do exactly that, in the development and construction of two new and advanced Offshore Wind RoRo vessels: Rotra Futura and Rotra Horizon. These vessels, of which the first one launched yesterday at Jiangsu Zhenjiang Shipyard…
Liebherr Equips Port Newark Container Terminal with Two New STS Cranes
Crane specialist Liebherr has delivered two ship-to-shore container (STS) cranes to Port Newark Container Terminal (PNCT), boosting its capability to handle the next generation of ultra large container vessels.Designed and manufactured at Liebherr’s Irish facility, the cranes are built to meet the specific demands of PNCT’s operations.The delivery is part of PNCT's ongoing $500 million expansion, aimed at bolstering capacity at one of the busiest ports on the US East Coast.These STS cranes feature an outreach of 226 ft (69 m) and a lift height over rail of 175 ft (53 m)…
Liebherr Celebrates 50 Years of Excellence
The LGM 1130 introduced in 1974 was Liebherr’s first mobile harbour crane, and the LHM has evolved with innovative design features and technological advancements. This month, Liebherr celebrates over one half century of innovation.Over the decades, Liebherr has continuously adapted to market demands, introducing innovative models such as the LHM 250 in 1996 and the LHM 550 in 2010– The all-electric LPS 420 E from 2019 and the new LHM series introduced in 2022 reflect Liebherr’s…
Liebherr Delivers Portal Slewing Crane for Cargo Ops at German Port
The Liebherr portal slewing crane of type LPS 600, the first of its kind in Germany, has been delivered J. MÜLLER Weser to enhance its bulk and general cargo operations at the port of Brake.The project marks the first rail-mounted portal crane at the port of Brake, designed for an extended 650-metre travel path in one direction, with features like larger cable drum and video monitoring at the portal, amongst others.The LPS 600 features a 61-metre boom, a motorised grab control…
New Liebherr Mobile Harbor Crane Ordered at Antwerp XL
International Car Operator NV (ICO) has acquired a second Liebherr mobile harbor crane, the LHM 550, further enhancing its operational capabilities at the Vrasene terminal in Antwerp. The crane features a 54-meter outreach and a lifting capacity of up to 154 tonnes, solidifying ICO's position as a leader in the roll-on/roll-off (RoRo) cargo handling sector.The Vrasene terminal spans 125 hectares and processes approximately 7,000 vehicles daily, along with an increasing volume of project cargo transported by barge.
Liebherr’s Third STS Container Crane Makes Its Way to North American Port
Crane specialist Liebherr has delivered its third ship to shore (STS) container crane to PSA Penn Terminals in Philadelphia.PSA Penn Terminals received its third Liebherr STS crane in September 2024, complementing the two commissioned in 2018.The new STS crane features a 157 ft (48 m) outreach, a 60 ft (18.288 m) span, and a 50 ft (15 m) back reach, with a lift height of 115 ft (35 m) over rail and a safe working load (SWL) of 66 tonnes.The STS crane is designed to significantly boost operational efficiency and capacity at the terminal…
Liebherr Tech Helps Drive Wind-assisted AYRO
Liebherr worked with AYRO, the French industrial start-up that recently successfully equipped the Canopée vessel with four OceanWings, making it the first hybrid industrial cargo ship powered by wind.With a height of 37 metres and a surface area of 363 m² each, this automated, lowerable and patented vertical wingsail technology will help the ship cut fossil fuel consumption.AYRO’s 37-m-high wingsails require a special solution due to their size, especially regarding its electrical actuators.
Insights: Blake Powell, JMS Naval Architects
Blake Powell, president at JMS Naval Architects, discusses his career, company and latest trends in naval architecture and marine engineering.Please give a brief professional bio, including education, experience and overview of current duties as president of JMS Naval Architects.I earned my degree in Naval Architecture from the University of California, Berkeley where I attended on a Navy ROTC scholarship and was commissioned as a Diving and Salvage Officer after I graduated.
INEOS FPS Picks Liebherr’s RL 650 Offshore Crane for Unity Platform
INEOS Forties Pipeline System (FPS) has selected Liebherr for the supply of a new Ram Luffing (RL) series offshore crane for its Unity Platform in the UK North Sea.After more than 30 years of service, the currently installed RL crane on the Unity Platform has run its course, and will be replaced by Liebherr’s RL 650 technology.The RL 650 crane, said to be particularly suitable for a Not Permanently Attended Installation (NPAI), will fulfil all material handling for the offshore platform…
Siemens Gamesa, deugro, Amasus Offshore to Deliver Transport Vessels for Next-gen Offshore Wind Components
deugro Danmark and its partners Siemens Gamesa and Amasus Offshore said Tuesday they would bring two newly designed vessels customized for transporting offshore wind turbine components to the market.Siemens Gamesa and deugro have entered into a long-term charter agreement for these newbuild vessels, Rotra Futura and Rotra Horizon, which will be delivered in 2025. According to the companies involved, the new vessels have been designed to accommodate the increasing size and weight…
ONE-Dyas Opts for LiMain for Unmanned Offshore Rig
The Dutch oil and gas company ONE-Dyas is the first to purchase a Liebherr offshore crane, type RL 2600, in combination with the recently launched service concept Liebherr Intelligent Maintenance (LiMain). LiMain is a fully digital, remote, and semi-automatic maintenance system, and with it ONE-Dyas can remotely maintain the new Liebherr craneon the unmanned platform.ONE-Dyas will install the first electrified gas production platform in the North Sea, designed to run entirely on offshore wind power from the nearby Riffgat Offshore Wind Farm.
VIDEO: Liebherr Debuts Lift Height Extension of STS in Australia
Liebherr Container Cranes completed its first ship to shore lift height increase with their new patented jacking system as part of Liebherr Transform. The operation was conducted under the supervision of Liebherr engineers at Patrick Terminals – Brisbane Autostrad.Patrick Terminals – Brisbane Autostrad located on the eastern coast of Australia is one of the world’s most advanced container terminals. Liebherr have two ship to shore container cranes at the terminal, a new STS currently being commissioned and an STS supplied in 2015.
Liebherr Delivers Mobile Harbor Crane to Port Esbjerg
Last week, Liebherr-MCCtec Rostock GmbH delivered a new LHM 800 High Rise mobile harbor crane to its customer Port Esbjerg.The delivery took place shortly after an incident in the Kiel Canal, in which an LHM 600 ordered by Port Esbjerg was damaged while passing under the Holtenau High Bridge.Liebherr-MCCtec Rostock GmbH said it sent service engineers and technical specialists to assess the situation on site and to assist with the recovery immediately after the incident. Every effort was made to deliver a replacement unit to Port Esbjerg as quickly as possible…
Liebherr Expands All-electric Heavy Lift Ship Crane Series
Driven by the growth in the size of wind turbines, Liebherr's all-electric heavy lift crane series is being expanded with an 800-tons crane. "The new cranes follow on from a long tradition and decades of experience in building ship cranes. The first ship crane was delivered by Liebherr in 1958. The push into the 800 tonnes size segment does not represent new territory - Liebherr has already supplied onshore and offshore cranes in the 3000-5000 tonnes category," said Gregor Levold…