Linked Network News

Heavy Goods Through Port of Hamburg

On 10 August 2009, the Port of Hamburg was the scene of a very special event. The Unikai team successfully managed the loading of an outsized consignment manufactured by the Pullach-based Linde Engineering Division. Destined for a petrochemical plant in Brazil, this project delivery consisted of a total of 3,600 cubic metres of system components, all of which were successfully transferred with the help of a mobile crane and securely stowed on board the M/V Grande Buenos Aires, a vessel belonging to the Grimaldi shipping company.