Liquefaction Processing Equipment News

DNV to Class World's First LNG FPSO

DNV has been contracted to class the Petronas LNG FPSO (Floating Production, Storage, Offtake) vessel to be built by Korea's DSME. The unit will be built by DSME in Korea and is destined for the Kanowit field offshore Sarawak, Malaysia. It is expected to be the world’s first floating liquefaction unit in operation when completed in 2015. The Petronas FLNG will be 300m long and 60m wide and will be moored 180km from shore. It is designed to produce 1.2 million tonnes a year (mtpa) of LNG, boosting Malaysia’s total LNG production capacity from 25.7 mpta to 26.9 mpta. The scope of the DNV contract includes the floating structure, mooring arrangement and natural gas liquefaction technology. • ship-to-ship offloading equipment suitable for LNG transfer at sea.