Offshore Location Site News

Ampelmann on Jumbo Javelin

One of Jumbo Offshore’s heavy lift & installation vessels, the DP2-ship Jumbo Javelin, is preparing to deliver installation services for offshore wind farms. It will be able to ship and install Transition Pieces (TP’s) for wind turbines. The vessel will be able to carry nine TP’s at a time, each with a weight of approx. 285 tonnes. All the TP’s can be stowed vertically in the hold of the vessel and transported to the offshore location site. There, the Jumbo Javelin positions itself on DP next to the monopile of the wind turbine foundation to lift the TP from the hold…