Pgs Production As News

Teekay to Pursue FPSO Projects

Production Storage and Offloading (FPSO) units. and Chief Executive Officer. that will result from this increased offshore oil production. Mr. customers and should increase our investment in this area. Production Espen Klitzing. The joint venture will only encompass new projects. venture. venture are to be finalized during the second quarter of 2006.

First Wärtsilä Marine DF Engines Ordered

Wärtsilä Corporation has received the first order for Wärtsilä 32DF marine engines. PGS Production in Norway has contracted for two Wärtsilä 18V32DF engines to be installed in the FPSO (floating, production, storage and offloading) vessel "Petrojarl I". The two engines, each developing 3,720 kW at 720 rpm, will be supplied as complete generating sets. They will burn wellhead gas. Built specifically as an FPSO vessel for North Sea service in 1986, the "Petrojarl 1" has been fitted with various additional equipment over the years. The two Wärtsilä-engined sets will therefore add necessary electricity generating capacity. They are currently being installed during a planned major drydocking before the vessel takes up a three-year contract on the Glitne field in the North Sea.