Position Site News

Rig Moves: Mobilized for Performance

The operation of an oil field involves moving rigs or jackups in a maneuver referred to as a rig move. These complex operations require experience and the coordination of all stakeholders. Explanation by Pål-André Malø, superintendent for new construction, and former AHTS captain (Anchor Handling Tugs Supply) with Bourbon Offshore Norway. "Generally speaking, this operation mobilizes between 3 and 4 vessels tasked with pulling the anchors of the rig to position it. Most of the time, there are 8 anchors - sometimes 10 or 12 - weighing 6 to 20 tons each," Pål-André explains.