Preferred Subsea Cable Repair Contractor News

Global Marine Energy Gets UK Offshore Wind Farm Maintenance Contract

The cable maintenance agreement is designed to ensure that the transmission link is inspected and maintained properly over its service life. •        A framework agreement for cable related incidents, such as repairs, surveys and re-burial activities. •        The selection of Global Marine Energy as the preferred subsea cable repair contractor. •        The production of a set of agreed procedures to cover submarine cable related incidents at the Ormonde site. A leader in the Offshore Transmission Regime (OFTO), Transmission Capital Partners was selected by Ofgem in 2010 to run the transmission link for the 150 MW Ormonde offshore windfarm off the Cumbrian coast.