Regular Thermal Imaging Surveys News

DP Failures on Mobile Offshore Drilling Units

In two recent incidents, dynamically positioned drillships lost functional thrusters due to an electrical disturbance when attempting to reconnect a faulty thruster after maintenance. When the thruster was reconnected it was not electrically isolated from other thrusters and the thrusters did not "ride through" the disturbance causing loss of thrust. During these incidents the drillship crews were unable to restore all functional thrusters and as a consequence these drillships lost position and had to initiate the emergency disconnect sequence (EDS). In another incident a dynamically positioned drillship encountered severe weather with high, shifting winds that caused it to lose position and initiate the EDS.