Robert Kopas News

U.S. Navy’s LHD 8 Completes Builder's Trials

The future USS Makin Island (LHD 8) successfully underwent Builder's Trials Dec. 13 in the Gulf of Mexico. The trials mark the first time this amphibious assault ship has gone to sea on its own power. "The ship performed very well during these trials," said Capt. Jeff Riedel, the amphibious ships program manager in the Navy's Program Executive Office (PEO), Ships. These trials, conducted by Northrop Grumman Shipbuilding (NGSB), made history in two ways. Makin Island is the first LHD to get underway on gas turbine engines and the first LHD to get underway on electric propulsion motors. Makin Island's first-of-kind hybrid gas turbine electric drive propulsion system will provide substantial fuel savings and increased operational flexibility over the life of the ship.

SECNAV Tours Next Generation Amphibious Assault Ship

Secretary of the Navy, Donald C. Winter visited Pre-Commissioning Unit (PCU) Makin Island (LHD 8) May 29, as part of a scheduled Gulf Coast visit. Winter toured the Northrop Grumman Shipbuilding (NGSB) facility and spaces aboard . His primary goal for the tour was to review updates on the overall shipbuilding activities at NGSB and for a status assessment of what's happening with . "The overall integration of combat systems in particular was most helpful, and I think it helped gauge not only where we are right now but where we'll be in the future," Winter said.