Scotty Tibbs News

Offshore Update: Waiting on Feds to Issue Permits

Marine companies along the Gulf of Mexico have seen little new business since the offshore drilling moratorium was lifted in early October as oil producers apply for permits and decide how to navigate costly safety regulations. At Bollinger Shipyards, Inc., one of the top U.S. boat builders, Chief Executive Officer Boysie Bollinger, said “we're waiting for BOEM to start issuing offshore drilling permits, and no one has any idea when that will be.” He wonders if the government knows when more permits will be released.

Vessels: Big Cat Express: A Very Fast Sea Trial

It's 8:30 a.m. as the Big Cat Express saddles up to the dock at the Port of Morgan City, La. It is Sea Trial day for the big quad engine catamaran ferry. No question she is waterjet powered as the tops of the blue "buckets" of the four Hamilton Jet 651's break the surface of the water at the stern. Just above the buckets are the exhausts, large four stainless steel pipes that curve downward toward the water. About 25 pickup trucks and my Ford Taurus wait the arrival of the 150-ft. by 34-ft. vessel. Painted gleaming white, the three-deck vessel looks like it was built for speed. Today we will find out just how fast it can travel. Emerging from the vehicles were several executives from Gulf Craft, Inc.

Vessels: Fewer, but More Capable OSVs Being Produced in Gulf Shipyards

As noted in the accompanying article the Gulf of Mexico is in the midst of a drilling malaise. The days when southern shipyards routinely turned out 50-60 supply boats and an equal number of crew/supply vessels is over at least for the time being. The last three years has seen an unprecedented number of OSVs joined the fleets of Tidewater, Hornbeck, Otto Candies, Edison Chouest and other major offshore operators. Leevac Shipyards is a prime example. For the last four years they have built almost exclusively for Hornbeck Offshore Services, producing a number of 200-260 ft. very capable supply boats including four 240-ft. platform supply vessels in 2003. Today their order book includes a huge casino boat and a large 445-ft. by 78-ft. tank barge, but no OSVs. Quality Shipyards, Houma, La.

Designers Aim for More Flexibility, Efficiency and Multi-mission Capabilities

Four years into the new Millennium designers of workboats are incorporating new technologies and greater efficiencies into their designs to produce vessels that can do more work and do it better than designs of just a few years ago. This is very prevalent in the oil patch where today's supply boat designs emphasize more efficient vessels that can carry as much material to the rig or platform as vessels 30-40 ft. longer in years past. "Our new 207 ft. supply vessels can carry over 6,000 barrels of liquid mud," said Robert Socha, marketing manager of Bollinger Shipyards, Lockport, La. "That is a key feature of these vessels that can work the new deeper gas wells on the shelf and also carry drilling liquids to the growing number of deepwater wells now in service," Socha added.