St Catharines Museum News

Welland Canal Seaway Tie-up Walls to be Reconstructed

The St. Lawrence Seaway Management Corporation (SLSMC) announced today that Oakville based Dufferin Construction has been awarded a contract to replace a series of ship tie-up walls on the Welland Canal. The contract, which entails the removal of the present timber tie-up walls and the construction of new tie-up walls using steel and concrete, is valued at $86 million. The balance of the funding envelope is dedicated to engineering, the purchase of various supplies, and inspection activity. The tie-up walls to be replaced are located alongside Lock 1 (in the vicinity of Lakeshore Road), Lock 2 (in the vicinity of Carlton Street) and Lock 3 (in the vicinity of the St. Catharines Museum).

The St. Lawrence Seaway Opens March 22nd

Study Reveals that Great Lakes Seaway System Supports 227,000 Jobs. Mr. Rob Bryson, Director of Eastern Canadian Grain Operations for Parrish and Heimbecker, and Donald Gallienne, Director, Finished Product Transportation Logistics for Aluminerie Alouette, will serve as keynote speakers at the opening of St. Lawrence Seaway’s 54th navigation season. The speakers will be sharing how marine transportation on the Seaway enables their firms to trade in a global economy. - Terence Bowles, President and CEO, St. WHERE: St.