Vigor Marine News
From SEAL Team Six to Silicon Valley, Inside Saronic's Shipbuilding Mission
In a shipbuilding industry defined by tradition, one new entrant is seeking to rewrite the rules of how naval vessels are designed, built and delivered. Saronic Technologies, founded just three years ago, is racing to create what CEO Dino Mavrookas calls “a next-generation shipbuilding ecosystem” — one capable of delivering unmanned surface vessels (USVs) at the speed and scale the U.S. and its allies will need to compete on tomorrow’s seas.Saronic Technology’s ambition is staggering: a vertically integrated…
WSF Ferry Wenatchee Suffers Electrical Issue
Sea trials on the Washington State Ferries (WSF) ferry Wenatchee (2,500 passengers, 200 vehicles) got off to a bad start last week, as WSF reports "investigation by our technicians and engine crew discovered last week the control system communication wires were creating intermittent instability which caused the drive motors to go offline."Invariably, problems crop up during most every vessel's shakedown, and WSF said "While unexpected, issues like this are a normal part of a vessel commissioning which involves rigorous inspection…
ABS and Saronic to Collaborate on Autonomous Ship Technology
ABS and US defense engineering company Saronic Technologies have signed a memorandum of understanding (MOU) to explore autonomous technologies for maritime applications.The agreement establishes a cooperative framework for both organizations to collaborate on projects related to improving technical requirements for autonomous surface vessels (ASV) and classification services for Saronic's autonomous capabilities.In July, Saronic entered a partnership with Vigor Marine Group focused…
Saronic, Vigor Form Alliance to Advance Autonomous Maritime Capabilities
Saronic Technologies and Vigor Marine Group have entered into a strategic partnership focused on rapidly advancing the delivery of autonomous maritime capabilities and strengthening operational support for defense and commercial customers.The partnership brings together two trusted maritime innovators with complementary capabilities, whose combined expertise can help support U.S. government and commercial customers in a rapidly changing environment.Vigor brings decades of experience in complex aluminum and small vessel fabrication…
Shipbuilders Council of America Announces Annual Safety Awards
The Shipbuilders Council of America (SCA), the national association representing the U.S. shipbuilding, maintenance, and repair industry, announced its annual member safety awards for the 2024 calendar year. This year, 14 shipyards are receiving awards for their achievements in safety. The shipbuilding industry continues to improve on safety metrics year after year. This commitment to safety has allowed U.S. shipyards to address and adapt their continuing operations to any obstacles that arose throughout the year.To qualify for an SCA Safety Award…
Washington State Ferries Goes Out to Bid for New Hybrid-electric Vessels
Deliveries will begin in 2028 if all goes well. Delays and escalating costs have bedeviled the procurement process up until now.Washington State Ferries on Thursday published an invitation to bid on building five new hybrid-electric ferries, an overdue achievement that promises to eventually bring more reliability to cross-Sound ferry service.It’s the first time in more than 50 years that the state will accept bids from shipyards nationwide to construct its vessels. Going out to bid on this contract also represents a major step toward electrification of the WSF fleet.
US Navy Awards Maintenance Contracts
The Pentagon last Friday announced that nine companies have been awarded contracts for repair, maintenance and modernization of U.S. Navy’s non-nuclear surface ships homeported or visiting the Northwest United States.The total value of the multiple award contract is a combined $944 million. The scope of work is for continuous maintenance, emergent maintenance, and Chief of Naval Operations availabilities, which are short-term or less than 10-months in duration.The nine companies are East Coast Repair & Fabrication…
Vigor Wins Repair Contract for Hospital Ship USNS Mercy
Vigor Marine has been awarded a contract for a 93-calendar day shipyard availability for a mid-term availability of Military Sealift Command’s (MSC) hospital ship USNS Mercy (T-AH 19).The $21,198,656 firm-fixed-price contract includes a base period and options, which if exercised, would bring the cumulative value of this contract to $21,711,746. Vigor was the sole bidder for the project.Work will be performed in Portland, Ore., beginning March 15, 2024, and is expected to be completed by June 15…
Vigor Awarded USS Gridley (DDG 101) Repair Work
Vigor Marine has been awarded a contract for the maintenance, modernization, and repair of the U.S. Navy Arleigh Burke-class destroyer USS Gridley (DDG 101).The $37,398,872 firm-fixed-price contract includes options which, if exercised, would bring the cumulative value of this contract to $39,776,408.Work will be performed in Everett, Wash., and is expected to be completed by October 2023. If all options are exercised, work will continue through October 2023.This contract was competitively procured via the Federal Business Opportunities website, with four offers received.
Vigor Wins Repair Contract for Hospital Ship USNS Mercy
Portland, Ore.-based Vigor Marine has been awarded a contract for a 90-calendar day shipyard availability for a mid-term availability of Military Sealift Command’s hospital ship USNS Mercy (T-AH 19).The $20,187,816 firm-fixed-price contract includes a base period and options, which if exercised, would bring the cumulative value of this contract to $20,915,538. Work will be performed in Portland, Ore., beginning January 16, 2023, and is expected to be completed by April 15, 2023.
Vigor Wins $131 Million Navy Ship Repair Deal
Portland, Ore. based shipbuilding and repair company Vigor Marine has been awarded a $131,151,747 firm-fixed-price contract action to accomplish the USS John Paul Jones (DDG 53) 2C1 dry-docking selected restricted availability (DSRA).The contract includes options which, if exercised, would bring the cumulative value of this contract to $131,826,808.Work will be performed in Seattle (77%) and Everett, Wash. (23%), and is expected to be completed by February 2024.This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(3).
Vigor Wins $133 Mln US Navy Repair Job
Vigor Marine has been awarded a $133,406,869 firm-fixed-price contract to prepare for and accomplish repair and alteration requirements for USS McCampbell (DDG 85) chief of naval operations scheduled depot maintenance availability. The contract includes options which, if exercised, will bring the cumulative value of this contract to $155,621,173.The Arleigh Burke-class guided-missile destroyer departed Fleet Activities Yokosuka, Japan on July 2, and is currently is en route to Vigor's Portland, Ore. shipyard, where she will undergo her midlife modernization.
Vigor Wins $30 Mln Ship Maintenance Contract
U.S. West Coast shipbuilder and repair provider Vigor Marine has been awarded a $30,269,098 firm-fixed-price contract for a 120-calendar day post shakedown shipyard availability of the expeditionary sea base ship Miguel Keith (T-ESB 5), owned and operated by the U.S. Navy's Military Sealift Command.Work will be performed in Portland, Ore. and is expected to be complete by December 2020.Work will include the furnishing of general services, shipboard access, clean and gas free tank voids and cofferdams…
Vigor Wins Contract to Overhaul Hospital Ship Mercy
Vigor Marine has been awarded a $56,450,644 firm-fixed-price contract for a 210-calendar day split shipyard availability for the regular overhaul and dry docking of the hospital ship U.S. Naval Ship Mercy (T-AH 19).Work will be performed in Portland, Ore., and is expected to be complete by August 2021. The deal includes one base period and 17 options that, if exercised, will bring the cumulative value to $61,201,329. The contract was competitively procured, but Vigor was the only shipyard to bid for the project.
Vigor to Overhaul USNS Guadalupe
Military Sealift Command has awarded a $20,880,790 firm, fixed-price contract to Portland, Ore. shipyard Vigor Marine for an 87-day shipyard availability for the overhaul dry-docking availability of the underway replenishment oiler USNS Guadalupe (T-AO 200).Scheduled work includes the furnishing of general services, shipboard access, clean and gas free tank voids and cofferdams, preservation of aft ballast and cargo tanks as well as the flight deck, overhaul repairs to main engine turbochargers and HP air compressor…
Vigor Wins $35m Navy Contract
Vigor Marine LLC, Portland, Oregon, is being awarded a $35,000,000 firm-fixed-price, indefinite-delivery/indefinite quantity contract to prepare for and accomplish repair and alteration requirements in support of upcoming dry-docking selected restricted availabilities (DSRA) for DDG 51-class destroyers. This contract will support the dry-docking and facility support requirements for a DSRA and includes dry-docking support, office spaces, warehousing, lay-down, security, crane support, utilities, galley services and other ship’s force support. Work will be performed in Seattle, Washington, and is expected to be completed by September 2020.
Vigor Wins $19.6m Navy Ship Repair Contract
Vigor Marine LLC, Portland, Oregon, is being awarded a $19,629,518 firm-fixed-price contract to prepare for and accomplish repair and alteration requirements for USS Kidd (DDG 100) Chief of Naval Operations scheduled, selected restricted availability (SRA) in support of the DDG-51-class destroyer ship repair program. For U.S. Naval Surface Combatants – typical repair and maintenance work to be performed in SRA includes modernization ship alterations; blasting, painting and surface preparation for complete or touch-up preservation, freeboard, struts, rudders, running gear, ground tackle, and sea-chest; hull, mechanical and electrical; various interior tanks. Work will be performed in Everett, Washington, and is expected to be completed by September, 2018.
Vigor Wins $10.3M Navy Repair Deal
Vigor Marine LLC, Portland, Oregon, is being awarded a $10,268,877 firm-fixed-price contract for a 45-calendar day shipyard availability for the regular overhaul and dry docking of USNS Matthew Perry (T-AKE 9). Work will include clean and gas-free tanks, voids, cofferdams and spaces, deckhouse preservation, main generator maintenance and cleaning, high voltage switchboard and emergency switchboard cleaning, shell and deck steel replacement, dry-docking and undocking, propeller shaft and stern tube inspect, forward and aft stern tube seal inspection and overhaul, underwater hull cleaning and painting, freeboard cleaning and painting, sea valve replacements, renew flight deck nonskid, and reverse osmosis unit sea-chest installation.
Alaskan Ferry Repower Completed
Elliott Bay Design Group (EBDG), a naval architecture and marine engineering firm with offices in Seattle, New Orleans and Ketchikan, Alaska, today announced the completion of the M/V Columbia repower. EBDG provided design services and ongoing owner support services for the ferry's repower, which was performed by Vigor Marine in Portland, Ore. "The Columbia was designed for the Alaska Marine Highway System (AMHS) by EBDG's predecessor firm, so we're intimately familiar with the vessel and its systems," said EBDG Project Manager Matt Williamson.
US Navy Build Programs Face Budget Pressure
Ship construction programs move ahead, but it’s not smooth sailing. Navies and Coast Guards everywhere face budgetary pressure, even in the U.S. which has the largest Navy in the world. The balance between desire for capacity and capability and pressure for affordability has never been more acute with the precarious budgetary issues presented by declining defense budgets, sequestration, continuing resolutions and government shutdowns. Even so, there are ongoing major construction efforts to include large nuclear aircraft carriers and submarines…
Shipbuilding: Vigor Industrial Grows Stronger
Vigor Industrial has ballooned from a modest shipyard in Portland, Oregon, to the largest shipbuilder in the Pacific Northwest and Alaska. Vigor increasingly thinks big and builds big. The company’s new floating dry dock will be the largest in the United States. And Vigor wants to get even bigger. CEO and owner Frank Foti expresses an ambition to grow to twice the current size in the “next few years.” Foti, who is also chairman of the Shipbuilder’s Council of America, says he is, “striving for critical mass.
U.S. DoD Awards Oiler Drydocking Contracts
Listed among the latest Department of Defense, Navy, contracts, Detyens Shipyards, Inc., is to overhaul and drydock the 'USNS Leroy Grumman' and Vigor Marine LLC is to carry out the same on the 'USNS Yukon'. 1. Detyens Shipyards, Inc., North Charleston, S.C. is being awarded a $9,654,055 firm-fixed-price contract for a 55-calendar day regular overhaul and dry docking of fleet replenishment oiler USNS Leroy Grumman (T-AO 195). Work will include port main engine clutch and coupling overhaul…
Latest U.S. DofD Navy Contracts
Amongst the listing of new Department of Defense, Navy contracts. Vigor Marine LLC, Portland, Ore., is being awarded a $12,954,046 firm-fixed-price contract for a 120-calendar day post shakedown availability, regular overhaul and dry-docking availability of missile range instrumentation ship the USNS Howard O. Lorenzen (T-AGM 25). Work will include fuel oil fill; transfer and overflow systems modifications; main diesel engine fuel oil service piping modifications; relocation of AC seawater pumps; docking and undocking; and underwater hull cleaning and painting.