Van Oord inks Offshore Windfarm Deal

January 19, 2017

Van Oord has been awarded the contract for East Anglia ONE offshore windfarm by ScottishPower Renewables (part of the Iberdrola Group) for the transport and installation of 102 three-legged jacket foundations.

 
The East Anglia ONE offshore windfarm is located in the southern North Sea,  45 kilometers southeast of the town of Lowestoft, United Kingdom. The offshore wind farm will have 102 Siemens 7 MW wind turbines, with a total capacity of 714 MW.  Once operational in 2020, the offshore wind farm will deliver sustainable energy to 500,000 households.

Van Oord will be responsible for the logistics of all jacket foundations and piles, sourced from various suppliers, and the transport to the marshalling port of Flushing in The Netherlands. From there the foundations will be transported and installed with an installation vessel. The installation work is planned between half of April 2018 and the end of October 2018.
 

Related News

Building the Next-Gen Maritime Prepositioning Ship & Auxiliary Crane Ship US House Panel to Hold Hearing on Baltimore Bridge Collapse ABS and Seatrium Partner on Decarbonization and Energy Transition Kongsberg Thrusters for Six Tunisian PA Tugs Adversarial Seas: AI and the Evolving Cyber Threat in Maritime