Piacaguera Channel Draft Reduced

March 13, 2014

GAC informed that the maximum draft has been reduced in the Piacaguera Channel at Santos Port where Usiminas and Vale Fertil are located.

According to the new requirement, during zero tide, the maximum draft should be considered to be 8.7 meters. For a high tide of 1.1 meters or more over zero, the maximum draft should be considered to be 9.8 meters.
 

Related News

UK Bill Banning Live Animal Export Ready for Royal Assent Van Oord Launches Giant Offshore Wind Installation Vessel Methanol-Fueled Tugboat Launched Collapsed Baltimore Bridge Blasted into Pieces Worker Dies in Accident at Peru's Chancay Megaport Project