Shell to Boost Production at Perdido's Oil Project

December 12, 2023

Shell on Tuesday said it has made a final investment decision (FID) to boost production at the Perdido oil project in the U.S. Gulf of Mexico, starting in April 2025.

The company, which operates the platform, said it will add three wells that are expected to produce up to 22,000 barrels of oil equivalent per day (boepd) at peak rates. Perdido has a production capacity of 125,000 boepd at peak rates.

© Troy V Smith / Adobe Stock
© Troy V Smith / Adobe Stock

The wells will be drilled in the Great White unit, where Shell is operator with a 33.34% stake, with Chevron Corp and BP PLC holding 33.33% each.


(Reuters - reporting by Sabrina Valle in Houston, Arunima Kumar in Bengaluru; Editing by Krishna Chandra Eluri and Jonathan Oatis)

Related News

Fincantieri Wins First U.S. Navy LSM Contract, Advances 35-Ship Program Sanctioned China-Linked Tanker Turns Back to Hormuz after Gulf Exit Shipbuilding: Changing Shipyard Dynamics in Japan US Seizes Iranian Cargo Ship, Tehran Vows Retaliation