Great Lakes Shipyard Awarded Coast Guard Contract

March 19, 2013

USCG Cutter Neah Bay: Photo credit Great Layes Shipyard
USCG Cutter Neah Bay: Photo credit Great Layes Shipyard

The shipyard has been awarded a drydocking & repair contract for the United States Coast Guard Cutter 'Neah Bay' (WTGB-105).

Contracted work includes routine drydocking and underwater hull maintenance, including inspection and testing of propulsion systems; overhaul of sea valves and shaft seal assemblies; and other various cleaning, inspections, and repairs.

This will be the first of the USCG’s nine (9) 140-foot Bay Class ice breaking tugs to be drydocked using Great Lakes Shipyard’s new Marine Travelift. The Travelift, with a lift capacity of 770-tons, was specifically designed and sized to accommodate the Bay-Class Coast Guard Cutters.

Work on the 'Neah Bay' will begin in early May 2013 and is expected to be completed by late June.
 

Related News

Gulf Intercoastal Waterway Closed After Barge Strikes Bridge in Galveston Houthis Claim More Ship Attacks, Targetting US Warship and Merchant Vessel UK Confirms It Will Build Six New Warships DFDS to Invest $1.2 Billion in Six Battery Electric Ships Cruise Ship Arrives in New York with 44-foot Whale Carcass on Its Bow