UK Allision with Mooring Structures

October 21, 2008

The UK Marine Accident Investigation Branch (MAIB) issued the report of its investigation of a product carrier making heavy contact with mooring structures at a refinery on the River Thames on Feb. 25, 2008. While unmooring the vessel, the bow spring line was unexpectedly cast off. The pilot attempted to recover control of the vessel by laying alongside the next jetty, but the master (who was assisting) thought a different maneuver was being undertaken.

(Source: Holland & Knight)

Related News

ESL Shipping's First Plug-in Hybrid Vessel Electramar Christened UK Imposes Sanctions Over Russia-North Korea ‘Arms-for-oil’ Trade 'Tug Drone': KOTUG Pilots Innovative Line Transfer Solution Gulf Intercoastal Waterway Closed After Barge Strikes Bridge in Galveston Containership Lost Power Several Times Before Striking Bridge in Baltimore