TORP Files for Terminal License
January 31, 2006
TORP (Terminal Offshore Regas Plant) filed its application with the US Coast Guard and the Maritime Administration (MARAD) on January 12, 2006 for a license under the Deep Water Port Act, to build, own and operate an LNG receiving terminal in the Gulf of Mexico. TORP’s BIENVILLE Offshore Energy Terminal will be located approximately 63 miles south of Dauphin Island, Alabama, in 425 ft of water, and will be the first to utilize the HiLoad Technology for cost-effective offloading of LNG carriers offshore. Maximum send-out capacity for the terminal is projected at 1.4 Bcf/day.
Related News
Njord Survey Inks Equinor Pipeline Inspection Deal in Europe
ABS, PIL to Collaborate on Emissions Verification for Marine Fuels
NOIA Releases Offshore Energy Excellence Report
Iran Detains Two Container Ships for Maritime Violations
Oil Prices Jump as Ships Come Under Fire in Strait of Hormuz