TSGI Wins TxDOT Ferry Service Contract

October 4, 2019

In 2017, The Shearer Group, Inc. (TSGI) was awarded a five-year Indefinite Deliverable contract with the Texas Department of Transportation (TxDOT)

TSGI was tasked to provide the detail design of a double-ended diesel-electric ferry with energy storage capable of carrying construction 495 passengers / 70 cars, providing service from Galveston Island to Bolivar Peninsula. The ferry is currently being built at Gulf Island Shipyard in Jennings, Louisiana. TSGI will provide construction oversight to TxDOT during the entire construction process.

Photo: TSGI
Photo: TSGI

The diesel-electric with energy storage system will be provided by Siemens utilizing their Bluedrive PlusC technology with 1.4MWHr of energy storage to increase the safety and and reliability of the vessel. This system will deliver power to a pair of Voith Schneider cycloidal propellers via electric motors.

Specifications



Related News

Russia Steps in After India Drops Safety Cover for Sanctioned Vessels UK Confirms It Will Build Six New Warships Brunvoll System to Propel Cyan Renewables New SOV NASSCO Christens Fifth Ship in US Navy's ESB Program Maris Fiducia Finds Industry Partners for Hydrogen-Powered Bulk Shipping