Jumbo Set to Offload Heavy-lift Tunnel-boring Machine

April 4, 2013

'M/V Fairpartner' is due to discharge the largest tunnel boring machine (TBM) ever made at the port of Seattle, Friday, 5, April 2013.

The tunnel boring machine was built by Hitachi Zosen Corporation and loaded at Osaka, Japan. It consists of total 48 pieces weighing 7,777 metric tons and measuring 31.606 cubic meters; the heaviest item is close to 900 metric tons.

Loading Bertha in Japan: Photo credit Jumbo
Loading Bertha in Japan: Photo credit Jumbo

The tunnel boring machine was named ‘Bertha’ after Bertha Knight Landes, Seattle’s first female mayor.

With her 17 meters diameter and length of close to a 100 meters, the machine will dig the 2.8 km long SR99 tunnel beneath downtown Seattle and it should be operational in 2015.
 

Related News

Houthi Leader Vows to Escalate Attacks on Merchant Shipping US Sends Warship Through Taiwan Strait Ahead of Presidential Inauguration Conflict Heating Up Over Cosco's Megaport in Peru Kongsberg Thrusters for Six Tunisian PA Tugs Authorities Identify Sixth Bridge Collapse Victim