US Navy Accepts Delivery of LCAC 105

March 17, 2023

The U.S. Navy announced it accepted delivery of the next-generation landing craft, Ship to Shore Connector (SSC), Landing Craft, Air Cushion (LCAC) 105, March 8.

LCACs are built with configurations, dimensions, and clearances similar to the legacy LCACs they replace – ensuring that this latest air cushion vehicle is fully compatible with existing well deck-equipped amphibious ships, the Expeditionary Sea Base and the Expeditionary Transfer Dock. LCACs are capable of carrying a 60-75 ton payload. They primarily transport weapon systems, equipment, cargo, and assault element personnel through a wide range of conditions, including over-the-beach.

A landing craft air cushion (LCAC) in operations for the U.S. Navy. (Photo: Matthew Cavenaile / U.S. Navy)
A landing craft air cushion (LCAC) in operations for the U.S. Navy. (Photo: Matthew Cavenaile / U.S. Navy)

Textron Systems of Slidell, La. is currently in serial production on LCACs 107-115.

“LCACs are a critical tool for the Navy, the Marine Corps, and all of our warfighters,” said Amphibious Assault and Connectors Program Manager, Program Executive Office (PEO) Ships, Capt. Jason Grabelle. “This delivery comes at an important time for the fleet, and their inclusion will only strengthen our posture.”

The delivery of LCAC 105 comes after completion of acceptance trials conducted by the Navy’s Board of Inspection and Survey, which tested the readiness and capability of the craft to effectively meet its requirements.

Related News

Houthi Leader Vows to Escalate Attacks on Merchant Shipping US Navy Names Future Warship USS Helmand Province Unfinished Hornbeck MPSV Arrives at Eastern for Build Completion VARD to Build Hybrid Ocean Energy Construction Vessel for Island Offshore Bollinger Names Andy Naquin Sales VP