Marine Link
Friday, April 19, 2024
SUBSCRIBE

Gas Liquefaction Technology News

11 Jul 2019

Novatek Signs LNG Equipment Deal

The Russian natural-gas company Novatek and Atomenergomash, a mechanical engineering division of the Rosatom State Corporation, have signed a memorandum on strategic partnership and localizing the fabrication of critical equipment for liquefied natural gas (LNG) production.Novatek said that under the memorandum, the two companies will cooperate in the long term to localize the fabrication of pumps, heat exchangers and other equipment for Novatek's LNG projects at Atomenergomash's facilities.The Memorandum notes the results already achieved on the fabrication of coil-wound heat exchangers and medium-tonnage cryogenic pumps, and establishes the obligations of the Parties on design…

27 Jan 2016

Eagle LNG Seeks Greenlight for LNG Exports

Eagle LNG Partners has submitted an application with the US Department of Energy (DOE) requesting long-term, multi-contract authorization under Section 3 of the Natural Gas Act to engage in exports of natural gas in the form of liquefied natural gas (LNG). The application seeks authorization to export up to 49.8 Bcf, or ~1.0 million tons per annum (mtpa), of LNG per year to both free trade agreement (FTA) and non-free trade agreement (non - FTA) countries. The authorization is for Eagle LNG Partners’ proposed FERC-jurisdictional LNG export facility in Jacksonville, Florida, and requests authorization from the DOE to export LNG on its own behalf and as an agent for other organizations.

27 Sep 2012

DNV to Class World's First LNG FPSO

DNV has been contracted to class the Petronas LNG FPSO (Floating Production, Storage, Offtake) vessel to be built by Korea's DSME. The unit will be built by DSME in Korea and is destined for the Kanowit field offshore Sarawak, Malaysia. It is expected to be the world’s first floating liquefaction unit in operation when completed in 2015. The Petronas FLNG will be 300m long and 60m wide and will be moored 180km from shore. It is designed to produce 1.2 million tonnes a year (mtpa) of LNG, boosting Malaysia’s total LNG production capacity from 25.7 mpta to 26.9 mpta. The scope of the DNV contract includes the floating structure, mooring arrangement and natural gas liquefaction technology. • ship-to-ship offloading equipment suitable for LNG transfer at sea.

09 Sep 2003

PDVSA Sees Shell, Mitsubishi LNG JV Deal

PDVSA expects to sign a final JV deal with Royal Dutch/Shell Group and Mitsubishi Corp. to develop the $2.7B Mariscal Sucre LNG project by the end of Nov.2003. PDVSA recently decided to use Shell's gas liquefaction technology in the project.

21 Sep 2007

Linde forms Global Alliance with SBM

Linde has formed a Global Alliance with Single Buoying Mooring Inc. (SBM) to develop and market Floating Production, Storage and Offloading units (FPSO) for the growing Liquid Natural Gas (LNG) industry, based on Linde's proprietary natural gas liquefaction technology. After having finalized a generic concept for a LNG FPSO with a yearly capacity off app.2.5 million metric tons of LNG, global marketing efforts will start as of today. The FPSO is designed for any conventional natural gas composition and aims at offshore natural gas fields with recoverable reserves of 1 trillion cubic feet or more. Under the Global Alliance Linde contributes the FPSO topsides including gas pretreatment…