Marine Link
Thursday, April 25, 2024
SUBSCRIBE

Ketchikan News

22 Dec 2023

Vigor Completes Works on USCGC Vessel Ahead of Time

USCGC John McCormick (Credit: U.S. Coast Guard)

Vigor Alaska, a Titan Company, successfully completed a dry dock and repair work solicitation on U.S. Coast Guard Cutter John McCormick this month, returning it to service ahead of schedule.The $3.65 million contract was awarded in September 2023 and represents the first non-emergent maintenance solicitation awarded to the Ketchikan Shipyard since 2011.USCGC McCormick is homeported at Coast Guard Base Ketchikan, only 3.5 miles from the Ketchikan Shipyard.This was also the first time a vessel of USCGC McCormick's class has been serviced at Ketchikan Shipyard…

28 Nov 2023

Allen Marine Tours to Repower Two Vessels with Scania Engines

(Photo: Allen Marine Tours)

Scania was selected by Allen Marine Tours to power a pair of their eco tour vessels. The two 78-foot QUAD powered vessels will each be repowered with Scania V8 DI16 082M, 800 HP engines delivered by Cascade Engine Center. The custom-built catamarans are capable of 30 plus knots at their full capacity of 150 passengers, and speeds in excess of 35 knots with a lighter load.“We have seen a lot of interest in our V8,16-liter engines by tour operators in ecologically sensitive areas like Alaska due to their low environmental impact…

12 Sep 2023

Vigor Begins Vessel Maintenance Project for USCG in Alaska

File photo: USCGC John McCormick steams through the Gastineau Channel to Juneau, Alaska. (Photo: John J. Mike / U.S. Navy)

The U.S Coast Guard has awarded Vigor Alaska, a Titan company, a $3.65 million contract to perform maintenance and repairs on U.S. Coast Guard Cutter John McCormick at the Ketchikan Shipyard.Work on the project begins this week and will cover comprehensive maintenance and repair of the vessel. After USCGC John McCormick is dry docked, the team at Ketchikan Shipyard will inspect the hull plating, conduct maintenance on the ship's propulsion system and renew hull coatings, as well as several other key maintenance and repair operations.

23 Aug 2023

NOAA Cuts Ribbon on Renovated Ketchikan Port Facility

A long line of special guests, including NOAA Administrator Dr. Rick Spinrad (5th from the left), participate in a ribbon-cutting ceremony for the NOAA-renovated port facility in Ketchikan, Alaska, on August 21, 2023. (Photo: NOAA Office of Marine and Aviation Operations)

Federal, tribal, state and local officials joined NOAA leadership to cut the ribbon on the agency’s newly renovated port facility in Ketchikan, Alaska. The celebration was held to dedicate the facility and recognize the important partnerships in the area.The facility will provide vessel support for NOAA research ships. The facility will also support NOAA Ship Fairweather, which is homeported in Ketchikan.“Having a home base for NOAA to operate from in Alaska is integral to our science…

29 Jun 2023

After Years of Delay, Alaskan Ferry Hubbard Finally Christened

First Lady Rose Dunleavy christens MV Hubbard with Ethan Waldvogel, Hubbard Relief Captain. Photo by Dawn Millen, AMHS. (Photo: Alaska DOT)

Hubbard, a new ferry built in 2019 for Alaska's Marine Highway System (AMHS), was formally christened this week after a change of plans put the vessel's entry into service on hold.The vessel is the second of two Alaska class ferries designed by Seattle-based Elliott Bay Design Group and constructed at Vigor Shipyard in Ketchikan, Alaska. Construction of both vessels began in October 2014. The series' first ferry, Tazlina, was christened in 2018, and Hubbard was completed in 2019.Intended to operate as day boats to serve the AMHS Lynn Canal route between Juneau…

22 Jun 2023

Shipbuilders Council of America Announces Safety Award Winners

(File photo: Metal Shark Boats)

The Shipbuilders Council of America (SCA), the national association representing the U.S. shipbuilding, maintenance and repair industry, announced its yearly member safety awards for 2023.“Workforce health and safety is embedded into the fabric of our industry because the teams that work in our shipyards and throughout the industrial base are the most important asset we have in building and repairing the U.S. commercial and military fleets,” said Matthew Paxton, president of the Shipbuilders Council of America.

08 Jun 2023

America's Sea Services Building Large Fleet of Small Ships and Craft

U.S. Navy Sailors aboard the amphibious dock landing ship USS Ashland (LSD-48), moor a landing craft, utility during amphibious operations, off the coast of Okinawa, Japan, in March 2023. (Photo: Christopher R. Lape / U.S. Marine Corps)

Not every vessel in the U.S. Navy is built for major combat operations on the high seas. There are large numbers of boats and service craft that provide essential services to the sea services, the nation and its partners.The U.S. Navy procures about 100 small boats per year. Some of these boats are based on commercial designs, procured to a Navy developed specification that tailors the requirements to the end user needs. They are procured and managed by two Naval Sea Systems Command program offices—PMS 300 and PMS 325.Compared to warships and auxiliaries…

27 May 2022

Shipbuilders Council Announces 2022 Shipyard Safety Awards

(File photo: Fincantieri Marinette Marine)

The Shipbuilders Council of America (SCA), the national association representing the U.S. shipyard industry, today announced the 2022 Annual Shipyard Safety Awards. SCA recognized a total of 15 U.S. shipyards and repair facilities with seven recipients receiving multiple awards.SCA honors shipbuilding and repair organizations with the “Excellence in Safety” Award and “Improvement in Safety” Award each year for enhancement of operations and promotion of safety and accident prevention.

26 May 2022

Bollinger Delivers USCGC Douglas Denman

U.S. Gulf Coast shipbuilder Bollinger Shipyards LLC has delivered the USCGC Douglas Denman to the U.S. Coast Guard in Key West, Fla. This is the 175th vessel Bollinger has delivered to the U.S. Coast Guard over a 35-year period and the 49th Fast Response Cutter (FRC) delivered under the current program.The USCGC Denman will travel to Alaska where it will be commissioned on September 28 in its new homeport of Ketchikan, in the 17th District of the Coast Guard. Once there, it will serve and safeguard the public…

06 May 2022

US Coast Guard Cutter Cuttyhunk Decommissioned

U.S. Coast Guard Cutter CuttyHunk (WPB 1322) (File photo: Eli J. Medellin / U.S. Navy)

The U.S. Coast Guard Cutter Cuttyhunk (WPB 1322) was decommissioned Thursday during a ceremony held at Air Station Port Angeles that was presided over by Capt. Mark McDonnell, 13th Coast Guard District Chief of Response.Cuttyhunk was one of the Coast Guard's 37 remaining 110-foot Island-class patrol boats. The fleet of Island-class cutters is being replaced by 154-foot Sentinel-class cutters built by Louisiana-based Bollinger Shipyards.Built by Bollinger Shipyards in Lockport, La.

30 Aug 2021

Infrastructure Update: An Earmark By Any Other Name

Photo: Lee Roberts / U.S. Army Corps of Engineers

After years of much talk but little action, major infrastructure funding from Congress now looks like it might actually happen. This in turn has prompted a restoration of the availability of earmarks, which had been, until about a decade ago, part and parcel of the congressional funding process. Within our nation’s inland waterways industry, hopes have been high that the rejuvenation of our country’s transportation infrastructure will include our inland waterborne commerce, and that…

19 May 2020

Interview: John Waterhouse, EBDG - “Be Bold in Thinking but Cautious in Application”

“I think we need to be bold in our thinking, but cautious in our applications. It doesn’t cost that much money to play around with ideas; and that small investment could turn up some great benefits. But if you’re afraid to make that initial investigation, things will pass you by.”
John Waterhouse, Elliott Bay Design Group

John Waterhouse is a ubiquitous character in the U.S. maritime industry, a deep-thinker, a signature bow tie and more than three decades of naval architecture and marine engineering experience and success as co-owner of the Seattle-based Elliott Bay Design Group (EBDG).While growing up, John Waterhouse spent some time in Vancouver, BC, Canada, and it was as a young boy standing on the shores of English Bay, watching ships come in from around the world to load and unload their cargos, when he realized that a maritime career could be his future.

12 Feb 2020

Titan Acquires HII's San Diego Shipyard

(U.S. Navy photo by Adam Ross)

One the United States' largest fleet service and ship repair sites is changing hands.Ship repair and commercial- and defense-related fabrication services provider Titan Acquisition Holdings announced on Wednesday it has reached a deal to acquire San Diego Shipyard from Huntington Ingalls Industries (HII). Financial terms were not disclosed. The transaction, expected to close in the second quarter, is subject to customary closing conditions.The San Diego Shipyard, formerly Continental Maritime of San Diego…

23 Dec 2019

UAS Announces New Marine Transportation Scholarship

Captain Michael A. Clinkscales / courtesy of HO/Clinkscales family

As tourism increases so will the demand for trained, licensed employees and sea pilots navigating the Inside Passage and a new University of Alaska Southeast (UAS) scholarship endowment was inspired to do just that.The Captain Michael A. Clinkscales Maritime Scholarship has been established to support UAS students enrolled in marine transportation courses. Fellow sea pilots led the cause to raise more than $38,000 in honor of “Clink,” a man who was known to inspire and encourage others in the maritime trades.

30 Aug 2019

MN100: Elliott Bay Design Group

Named one of this year's MarineNews' prestigious MN100 firms, Elliott Bay Design Group (EBDG) in 2019 expanded to the East Coast by opening an office in New York and teamed with AMD Marine Consulting Designs to be their exclusive North American vessel design representative. EBDG delivers designs that are better to build and better to operate.The Company:EBDG is a full-service, employee-owned company with offices in Seattle, New Orleans, Ketchikan and New York. The firm provides naval architecture…

10 Dec 2018

GREAT WORKBOATS: The Very Best 10 of 2018

MarineNews showcases the ten best of North America’s 2018 workboat deliveries. Domestic shipyard production is robust, innovative and getting greener. And, that translates into two kinds of ‘green.’As the domestic offshore energy support sector slowly awakens, other sectors have been happy to take the spotlight in its absence. As always, and if a hull was delivered in 2018, we took a look at it, with several areas as a focus for inclusion into this edition. For my part, I’m always excited when the U.S. boatbuilding sector can deliver for a foreign buyer. We’ve checked that box here. And, that’s because we can compete on price, quality and when we do…

21 Nov 2018

Alaska Marine Lines Expands to Arctic Ports

Alaska marine transportation company Alaska Marine Lines said that it is expanding its service from Seattle and Anchorage to the Arctic Region in 2019.Bowhead Transport will provide the destination services at the North Slope villages of Point Hope, Point Lay, Wainwright, Utqiagvik (Barrow), and Kaktovik. Alaska Marine Lines will also service Deadhorse with its two annual sealifts.Bowhead, thru its teaming agreement with Alaska Marine Lines, will continue to participate in the door-to-shore service to the Arctic that it initiated over 30 years ago.The new stops will be added to Alaska Marine Lines' many ports of call, joining the major hubs of Naknek…

17 Sep 2018

Passenger Medevaced from Cruise Ship in Alaska

U.S. Coast Guard 17th District Alaska medevaced a woman from a cruise ship near Ketchikan, according to an official press release.A 45-foot Response Boat-Medium crew from Coast Guard Station Ketchikan medevaced the 71-year-old passenger displaying stroke symptoms and brought her to awaiting EMS in Bar Harbor, Ketchikan.Coast Guard watchstanders in the Sector Juneau command center received the request for the medevac from the cruise ship Nieuw Amsterdam at about 9 p.m.The Coast Guard boat crew met up with the cruise ship in Revillagigado Channel where the patient, her husband and a medical attendant were brought aboard and transported…

09 Jul 2018

Nordic Lady: Keeping a Good Boat Up to Date

The Nordic Lady all back together and ready for sea trials. (Photo: 
 Southeast Diesel)

When Trygve Westergard bought the 98- by 28-foot Judi B in the spring of 2016 he was entering a new chapter in a varied marine career. Growing up on a remote island off Ketchikan, Alaska as the third generation of Norwegian-Danish family, he had fishing in his blood and his environment. A stint at the California Maritime Academy earned him an unlimited masters license and a BS in marine transportation.After a decade of running everything from ferries to off-shore boats and filling the gaps with fishing, Westergard decided it was time to come home.

27 Aug 2018

Coast Guard Receives New Response Boats in Alaska

Members of Coast Guard Station Juneau test the capabilities of their new 29-foot Response Boat — SMALL II, in Juneau, Alaska, July 10, 2018. The RB-S II is an upgrade to the current 25-foot Response Boat — SMALL and is due to phase it out soon. (U.S. Coast Guard photo by Jon-Paul Rios)

A new batch of response boats have been delivered to U.S. Coast Guard stations in Alaska this summer as part of the service's initiative to replace older vessels that have reached the end of their planned service life.The five new 29-foot Response Boat-Smalls, also known as Response Boat-Small IIs, were constructed by Louisiana boatbuilder Metal Shark Aluminum Boats and delivered to the Coast Guard's 17th District starting in May.Station Ketchikan received two new boats May 17…

23 Aug 2018

Shipyard Focus: Vigor

Image: Vigor

Diverse Newbuild & Repair Business Buoys 2018The year 2018 is off to good start at Vigor. The Harbor Island facility welcomed a new drydock christened the Evolution. The $20 million Evolution is the third drydock at Vigor’s Seattle facility and largest in the Puget Sound region, measuring 640 x 115.5 ft. with a lift capacity of 22,000 LT.Other investments in Seattle include a buildout of a dedicated aluminum production facility which greatly expands Vigor’s fabrication capabilities and capacity for workboats…

06 Sep 2017

Bollinger Delivers 25th Fast Response Cutter

USCGC Jacob Poroo in Key West, Fla. (Photo: Bollinger Shipyards)

Bollinger Shipyards has delivered the 25th Fast Response Cutter (FRC) USCGC Jacob Poroo to the U.S. Coast Guard on September 5, 2017 in Key West, Fla. The vessel’s commissioning is scheduled for November 8 in New Orleans. Ben Bordelon, Bollinger president and CEO, said, “This FRC built by Bollinger Shipyards will be the second FRC to be stationed in Pascagoula, Miss. Previous cutters have been stationed in Florida; San Juan, P.R.; Cape May, N.J.; Ketchikan, Alaska; Pascagoula, Miss. and Honolulu, Hawaii.

10 Nov 2017

Bollinger Delivers USCG Joseph Gerczak

USCG Joseph Gerczak (Photo: Bollinger Shipyards)

Bollinger Shipyards has delivered the USCGC Joseph Gerczak, the 26th Fast Response Cutter (FRC) to the U.S. Coast Guard. The Coast Guard took delivery on the 9th of November 2017 in Key West, Florida. The vessel’s commissioning is scheduled for March 9, 2018 in Honolulu, HI. Ben Bordelon, Bollinger President & C.E.O. said: “This FRC built by Bollinger Shipyards will be the second FRC to be stationed in Honolulu, Hawaii. Previous cutters have been stationed in Florida, San Juan, PR, Cape May, NJ, Ketchikan, Alaska, and Pascagoula, MS.