Marine Link
Tuesday, April 16, 2024
SUBSCRIBE

Oxfordshire News

19 Sep 2017

River Thames Simulation Supports Safer Navigation

HR Wallingford has created a River Thames navigation simulation to assess Tideway’s fleet of vessel masters (Photo: HR Wallingford)

The Thames Tideway Tunnel project, London’s new ‘super sewer’, which will upgrade the city’s 19th century sewerage system for today’s eight million plus inhabitants, requires excavation on an enormous scale. Creating a tunnel 25 kilometers in length, and running up to 65 meters beneath the River Thames, will generate immense volumes of spoil, right in the heart of London. To minimize the impact of transporting this on the capital’s roads, Tideway plans to transport around 4 million metric tons of this material by river.

12 Jun 2017

World’s Biggest Containership Eases into Felixstowe

The Madrid Maersk at Felixstowe's Berth 8 photographed by Captain Prithvi Singh, SCS pilot at Harwich Haven Authority, who piloted the Madrid Maersk out of Felixstowe.

The Madrid Maersk, the latest in a long line of record-breaking containerships, arrived on June 6, 2017 at the Port of Felixstowe’s newest quay, its first port of call in Northern Europe on its maiden voyage. As the world’s current biggest containership (weighing in at 214,286 metric tons, and a massive 399 meters long, with a beam of 58.6m), the Madrid Maersk is expected to set a record for carrying the maximum number of standard-sized containers (TEU) on its return leg to Asia.

18 Jan 2017

Optimizing Aberdeen's Harbour Expansion Design

Photo: HR Wallingford

A £350m ($431m) development plan to expand Aberdeen Harbour was approved on December 19, 2016. HR Wallingford has been involved in the project from its initial concept stages in 2010, and will be working with Aberdeen Harbour Board right through to construction, and undertaking modelling work for the approved contractor, Dragados UK Ltd. The new facilities will include 1,400 meters of new quay, with a water depth of up to 10.5 meters. Construction will begin in early 2017, with the project due to be completed in 2020.

23 Jun 2016

Viscometer Helps Coating Process

Oxfordshire based Chiltern Connections specialist is a provider of conformal coating machines and associated solutions for a wide range of industrial customers. Applications for their coating machines are generally highly specialised and a means of preventing corrosion or protecting important components from various environmental challenges and thereby helping to extend their working life. Viscosity control is an essential part of the coating process and as a leading supplier of specialist analytical instrumentation and equipment, including Brookfield Ametek Viscometers, FULLBROOK SYSTEMS have made an important contribution in helping Chiltern Connections to improve the reliability of their coating machines.

27 May 2014

Coast Guard Suspends Search for Missing Sailors

The U.S. Coast Guard suspended its search at 10 p.m., Friday, May 23, for the missing crew members of the 39-foot sailing vessel Cheeki Rafiki who reported distress approximately 1,000 miles east of Cape Cod, Massachusetts, on Friday, May 16. At the request of the British Government, the Coast Guard resumed search efforts at 7:38 a.m., Tuesday, having suspending its original 4,000-square-mile search on Sunday after the sailors had not been located. After an additional 21,000 square miles of searches, the U.S. Coast Guard suspended the second search.

26 Jul 2013

Brazil Class

To understand how ABS and DNV participate in Brazil’s complex and challenging Maritime and O&G industries, MR spoke to ABS’s João Carlos Ferreira , DNV’s Tommy Bjørnsen and their colleagues in Rio de Janeiro. The American Bureau of Shipping (ABS) is a non-profit classification society founded in 1862. ABS has been present in Brazil for more than 40 years, with more than 200 employees distributed between six offices in Brazil. “We have been providing classification services to the offshore industry longer than any other class society, and we are the current market leader in worldwide MODU classification and also market leaders in floating production units (FPI)…

12 Jun 2013

UK Offshore Renewable Energy Summer School

Early booking advised for the 2-week offshore renewable energy summer school (part of IDCORE 2013) aimed to expand & sustain a community of high-quality staff for the UK offshore renewable energy industry. The summer school (22, July – 2, August 2013 at HR Wallingford, Howbery Park, Wallingford, Oxfordshire OX10 8BA, United Kingdom
) uses taught sessions, case studies and hands-on activities delivered by industry experts. Participants will also gain practical experience in HR Wallingford's modelling hall and navigation simulator. Week one outlines site selection procedures, wave and tide theory, computational modelling (TELEMAC and SWAN), types of coastal structures and methods for determining forces on coastal and offshore structures.

17 Aug 2012

Handbook on Mast, Rigging & Sails Published Soon

Image credit Petrospot

'Rig Basics' will be launched on15 September, 2012,  at the Southampton Boat Show (Kelvin Hughes stand J001, Solent Hale). Rig Basics - How to Look After Your Mast, Rigging and Sails provides a concise, informative and clearly-written outline of what every yacht or sailboat owner or operator must take into account when looking after the mast, rigging and sails. It is also a highly useful guide to what a surveyor should be looking at when surveying a rig. Written by Kim Skov-Nielsen…

28 Jul 2005

Exmar Profits from LPG, LNG

During the first six months the LPG fleet contributed $19.7 million to the operating result (EBIT) (compared to $12.3 million for the first six months in 2004). This result was positively influenced by a profit of $4.7 million realized on the sale of the 50% participation of EXMAR in the LADY KIRA (5,000 m³/1994) and in the BIRGIT KOSAN (5,000 m³/1999). The Midsize, Ethylene and Pressurized segments contributed as budgeted and Time-Charter levels reflected a firm market sentiment. The VLGC fleet however did not meet expectations particularly due to persistent uncertainty on LPG pricing related to crude oil fluctuations and reduced product availability ex Arabian Gulf.