Marine Link
Thursday, April 25, 2024
SUBSCRIBE

Scott Smith News

15 Oct 2017

Metal Shark Delivers Potomac Riverboat Passenger Vessels

The first two passenger vessels built by Louisiana-based shipbuilder Metal Shark for Entertainment Cruises’ Potomac Riverboat Company division have been delivered to Washington, D.C. and are now in service. The  two 88’, 149-passenger high speed aluminum catamaran vessels “Potomac Taxi I” and “Potomac Taxi II” departed Metal Shark’s Franklin, Louisiana shipyard in mid-September, traveled the Gulf of Mexico coastline and crossed Florida via Lake Okeechobee before proceeding northward up the Atlantic coast to Washington, D.C. Powered by twin Scania DI13 081M engines delivering 500 HP at 1800 RPM, the USCG Subchapter T vessels were designed by BMT Designers and Planners and BMT Nigel Gee, and feature an environmentally friendly low wake / low wash hull design.

01 Jul 2013

Monitoring System Takes Guesswork Out of Mooring Mega Vessels

Fenders are primarily designed to withstand the onshore motion of a ship against jetties, wharfs and quaysides by minimizing impact damage and withstanding parallel ship movements.

Mooring of large vessels in the LNG, petrochemical and container sectors is an intricate and critical procedure. The process entails bringing together a moving object with a static object, and with the imminent advent of even larger vessels (liquefied natural gas tankers with a capacity of 200,000 cubic meters and container ships with a capacity of 22,000 TEU*), the forces involved are enormous. For tankers and bulk carriers, mooring frequently takes place alongside jetties at the end of finger piers…

20 Mar 2012

Trelleborg Patent Pending for Fender Load-Monitoring Systems

Trelleborg Marine Systems, a manufacturer of docking, mooring and berthing equipment, has received patent pending status on a system for monitoring the load on marine fenders. The new system is designed to help avoid disputes and the costly downtime associated with insurance claims. The marine fender load-monitoring system can be used to measure both the impact on fenders when a vessel berths, and the ongoing force applied as the vessel continues to bear against them while docked. “The data collected by this system could prove to be invaluable to ports and harbors all over the world in avoiding disputes and the costly downtime associated with insurance claims,” said Trelleborg Marine System’s Technical Director, Scott Smith.

15 Mar 2012

Iridium Next Constellation Passes Critical Milestones

McLean, Va. - With the planned commencement of the launch of its next-generation satellite constellation, Iridium NEXT, less than 36 months away, Iridium announced the completion of the satellite preliminary design review phase of the program. This phase concludes the preliminary design and specifications for all elements of the satellite system, including payload, main mission antenna, feeder links and cross links. “The foundation for Iridium NEXT satellite design is complete,” said Scott Smith, executive vice president, Iridium NEXT. Iridium NEXT is on track to further Iridium's position as a vital player in the global communications infrastructure.

25 Oct 2011

Trelleborg Marine Systems Centralizes in India

The regional offices of Trelleborg Marine Systems have in-house engineering capability, provide initial specification and front end applications engineering. The more detailed engineering design, modelling and analysis engineering for projects are sent to the Indian centre of excellence for progressing forward. Scott Smith, Regional Director for Trelleborg's Asia Pacific region, said: "We have very high expectations for the performance of the improved engineering and design centre in Ahmedabad.