Marine Link
Friday, April 19, 2024
SUBSCRIBE

Todd Pacific Shipyards Corporation News

19 Aug 2009

70 Shipyards Awarded ARRA Grants

The Department of Transportation has announced 70 grants totaling $98m in American Recovery and Reinvestment Act (ARRA) funds that will be used to improve small shipyards throughout the United States. The funds, awarded through the Maritime Administration’s Assistance to Small Shipyards program, will help create and preserve jobs, provide valuable employment training and make much needed improvements to shipyards across the country. The Small Shipyards Grant program provides up to 75 percent in ARRA funds for a project and requires the remainder be matched by the shipyard. A detailed list of the grantees is as follows. •    Aker Philadelphia Shipyard, Inc.,  Philadelphia, PA: $2,312,614, for the first year of training program.

27 Aug 2008

Todd Shipyards to Overhaul Aircraft Carriers

Todd Pacific Shipyards Corporation has been awarded a contract by the United States Navy to provide long-term overhaul and maintenance to the Nimitz Class aircraft carriers (CVN) homeported or assigned for maintenance in . The contract consists of multiple contract options for planned incremental availabilities (PIA’s) and docking planned incremental availabilities (dPIA’s) for the USS LINCOLN (CVN 72), USS STENNIS (CVN 74), USS NIMITZ (CVN 68), and the USS REAGAN (CVN 76). The availabilities extend through the last PIA and dPIA ending in 2013. The work to be performed includes non-nuclear ship repair, alteration and maintenance. The work will be performed by the Todd Pacific workforce or Todd Pacific’s subcontractors at the Puget Sound Naval Shipyard in…

23 Jun 2008

Commandant Presents Rear Adm. William M. Benkert Awards

Coast Guard Commandant Adm. Thad Allen will honor the recipients of the 2008 Biennial, Rear Adm. William M. Benkert, Marine Environmental Award for Excellence by presenting the awards during an American Petroleum Institute luncheon in . Silver Award -- U.S. Honorable Mention -- Todd Pacific Shipyards Corporation, Seattle, and SeaRiver Maritime Inc., . The award recognizes maritime industry businesses and corporations involved in marine facility or vessel operations that have demonstrated sustained excellence and outstanding achievement in protecting the marine environment. The award program also encourages innovations in operations, maintenance, cargo handling, refueling, training and the sharing of best practices throughout the industry.

26 Mar 2008

GPA Awarded Design Contract for Washington State Ferries

uido Perla & Associates signed a contract with Todd Pacific Shipyards Corporation to provide the design of a new 144-Auto ferry, satisfying the design portion of a design-build contract that Todd Pacific Shipyard, in conjunction with its major subcontractor J.M. Martinac Shipbuilding Corporation recently signed with Washington State Ferries. has budgeted $342 million for the construction of up to four vessels, which are to be constructed under this design-build contract. Each of the new ferries…

22 Dec 2003

Todd Shipyards Corporation Announces Dividend

Todd Shipyards Corporation announced that at a meeting conducted on December 17, 2003, its Board of Directors declared a dividend of ten cents ($0.10) per share to be paid March 23, 2004, to all shareholders of record as of March 8, 2004. The Company had previously announced its intent to pay a dividend of ten cents ($0.10) per share payable on December 23, 2003, to all shareholders of record as of December 8, 2003, and quarterly thereafter. Todd Shipyards Corporation is traded on the New York Stock Exchange (symbol TOD). Its wholly owned subsidiary, Todd Pacific Shipyards Corporation, performs a substantial amount of repair and maintenance work on commercial and federal government vessels engaged in various seagoing trade activities in the Pacific Northwest.

29 Dec 2003

Todd Shipyards to Reduce in Scope of Navy Repair Availability

Todd Shipyards Corporation announced today that the US Navy has reduced the scope of work requested to be performed by its wholly owned subsidiary, Todd Pacific Shipyards Corporation ("Todd Pacific"), on the USS Sacramento (AOE 1) during an upcoming availability originally scheduled to begin in the fourth quarter of the Company's current fiscal year. The availability, originally scheduled for 12 weeks, was to include a dry docking of the ship. The current plan is for a five-week, pier-side availability, the dollar value of which is not yet determined. The Sacramento is one of the four AOE class ships originally covered by the Company's six-year, cost-type contract with the Navy, under which the Navy has options to have Todd perform maintenance work on the ships.

15 Jan 2004

Todd Shipyards Announces Notification Decommissioning

Todd Pacific Shipyards Corporation has been informed by the US Navy that the USS Sacramento (AOE 1), is scheduled to be decommissioned on or about October 1, 2004. The Sacramento is one of the four AOE class ships originally covered by the Company's six-year, cost-type contract with the Navy, under which the Navy has options to have Todd Pacific perform maintenance work on the ships. The contract, which is the Company's fourth consecutive, multi-year contract with the Navy on the AOE class vessels, was awarded on a sole source basis in June, 2001. The original contract included options for thirteen repair availabilities to be performed in the 2001 through 2007 contract period and was expected to have a notional value of approximately $180 million if all of the options were exercised.

30 Jan 2004

Todd Pacific Shipyards Enters Contract with Electric Boat

Todd Pacific Shipyards Corporation announced today that it has entered into a contract with Electric Boat Corporation of Groton, Connecticut to support their work on Trident submarines. During the period from May to September 2003, Todd Pacific completed planning and preparation work for Electric Boat under a contract valued at less than $200,000. Todd Pacific has begun work on a follow-on contract to fabricate components and to accomplish associated steel outfitting, project management and quality assurance functions. This contract is associated with the refit work being accomplished by Electric Boat on the USS OHIO (SSBN 726) at the Puget Sound Naval Shipyard.

06 Feb 2004

Todd to Team with Bath Iron Works on Aegis Destroyer Overhaul Options

Todd Pacific Shipyards Corporation confirmed today its expected participation, along with Southwest Marine, Inc., San Diego Division, on the team lead by Bath Iron Works, a subsidiary of General Dynamics to perform Post Shakedown Availability work ("PSA") on DDG-51 Aegis Destroyers ("Destroyers"). The U.S. Navy contract for this work, which was awarded to Bath Iron Works, includes options for PSA work to be accomplished in Navy homeports of Everett, Washington and Pearl Harbor, HI. Todd Pacific's expected participation will include the performance of the PSA work on between one and three Destroyers that are expected to be homeported in Everett, Washington.

03 Mar 2004

Todd Pacific Shipyards Awarded Contract for Long Term Maintenance

Todd Pacific Shipyards Corporation has been notified that it has been awarded a contract with the United States Coast Guard ("Coast Guard") to provide long-term maintenance of Polar Class icebreakers. The contract consists of multiple contract options for planned maintenance availabilities (PMA's) and docking planned maintenance availabilities (DPMA's) for the POLAR STAR (WAGB-10) and POLAR SEA (WAGB-11). The availabilities, and their companion planning options, extend through the last DPMA ending August 5, 2008, and the last PMA ending on September 2, 2008. The work to be performed includes availability planning and generalized ship maintenance and repairs as needed, with emphasis on propulsion and deck machinery work.

02 Apr 2004

Todd Pacific Shipyards to Overhaul Carriers

Todd Pacific Shipyards Corporation has been awarded a five-year contract with the United States Navy to provide long-term overhaul and maintenance to the NIMITZ CLASS aircraft carriers (CVN) homeported in Puget Sound. The contract consists of multiple contract options for planned incremental availabilities (PIA's), docking planned incremental availabilities (DPIA's) and continuous maintenance and upkeep for the USS LINCOLN (CVN-72), USS STENNIS (CVN-74), USS NIMITZ (CVN-68) and USS VINSON (CVN-70) when they are in Puget Sound. The work to be performed includes all types of non-nuclear ship repair, alteration and maintenance. All on-board work will be accomplished by the Todd Pacific workforce at Puget Sound Naval Shipyard in Bremerton, Washington, or Naval Station Everett.

18 Aug 2000

Contracts

Bollinger Shipyards, Inc., Lockport, La., has signed a contract to build two, 250-ft., double hull, jumbo coastwise service, single rake hopper barges for Tide Leasing, LLC, Birmingham, Ala. Construction has begun on the first barge and building of the second vessel will begin in August. Both are scheduled for delivery in November 2000. Overall, each barge will be 250 ft. in length, with a 52.5-ft. beam and 14-ft. depth and 11.5 ft. maximum draft. They will be built with .75-in. steel at the hopper bottoms and .625-in. steel at the hopper sides plus .5-in. T-1 liner plates on the bottom and upper sides of the hopper. Each will be able to carry up to 3,000 metric tons of coal and will operate out of Santa Marta, Colombia. Shearer and Associates, Inc., Metairie, La.

26 Apr 2005

Todd Shipyards to Overhaul and Drydock USCGC Polar Star

Todd Shipyards Corporation announced that the U.S. Coast Guard has awarded to its wholly owned subsidiary, Todd Pacific Shipyards Corporation ("Todd Pacific" or the "Company"), a $8,777,829 modification to previously awarded contract HSCG85-04-C-625509 in support of repairs and alterations performed during the Dry-Docked Planned Maintenance Availability ("DPMA") of the icebreaker USCG Polar Star (WAGB-10). The contract modification provides for the alteration and repair of ship's systems, shipboard equipment and ship hull preservation. The work will be accomplished at the Company's shipyard in Seattle and is expected to be completed in August 2005.

14 Jun 2007

Todd Pacific, Martinac and Nicols Brothers to Submit Joint Proposal to WSF

Todd Shipyards Corporation announced that its wholly owned subsidiary, Todd Pacific Shipyards Corporation has reached an agreement with J.M. Martinac Shipbuilding Corp. and Nichols Brothers Boat Builders, Inc., to submit a Joint Single Proposal to build ferries for the Washington State Ferry System (WSF). A bill (SHB 2378) approved by the Washington State Legislature and signed into law by Governor Chris Gregoire earlier this year created a 30-day period during which "pre-qualified" and "best-qualified" shipyards -- Todd, Martinac and Nichols -- could seek to come to agreement on a Joint Single Proposal for the construction of four New 144-Auto Ferries for WSF. The discussions, which were moderated by the Governor's Office, concluded with an agreement to submit a proposal.

22 May 2007

Todd Shipyards to Overhaul USCGC Polar Sea

Todd Shipyards Corporation said that the U.S. Coast Guard has awarded to its wholly owned subsidiary, Todd Pacific Shipyards Corporation a $7.5m modification to previously awarded contract HSCG85-04-C-625509 in support of repairs and alterations performed during the Planned Maintenance Availability (PMA) of the icebreaker USCGC Polar Sea (WAGB-11). The contract modification provides for the alteration and repair of the ship's systems, engines and shipboard equipment. The work will be accomplished at Todd Pacific's shipyard in Seattle beginning immediately and is expected to be completed in August 2007. The PMA of the Polar Sea is being…

26 Mar 2007

Former Chairman of Todd Shipyard Dies

John T. Gilbride, a former chairman and chief executive of the Todd Shipyards Corporation, once the largest independent shipbuilding company in the country, died on March 17 at his home in Stamford, Conn. He was 90. The cause was lung disease, his son Frank said, as reported in the New York Times. Gilbride, who started as a pipe fitter’s helper at the Todd shipyard in Brooklyn when he was 14, was president of the company from 1958 to 1975, and its chairman and chief executive until his retirement in 1986. Founded by William H. Todd in 1916, the company built destroyers, cargo carriers and troop ships during both world wars. In World War II, it had 150,000 workers, most at its yard in Brooklyn. Well into the 1980s, more than 80 percent of the company’s business was with the Navy.

15 Aug 2006

Todd Shipyards to Overhaul CVN-72

Todd Shipyards Corporation said that the U.S. Navy has awarded to its wholly owned subsidiary, Todd Pacific Shipyards Corporation, a $10,949,272 modification to previously awarded contract N00024-00-C-4152. This modification represents the exercise of an option for the Docking Planned Incremental Availability ("DPIA") for USS Abraham Lincoln (CVN- 72), at Puget Sound Naval Shipyard commencing on September 5, 2006 and is expected to be completed March 15, 2007. Todd Pacific's workforce will perform pier side maintenance, repairs and alterations of various ships systems and equipment throughout the Lincoln. The DPIA of the Lincoln is being…

06 Jul 2006

Todd Shipyards Wins Navy Contract

Todd Shipyards Corporation announced that the U.S. Navy has awarded to its wholly owned subsidiary, Todd Pacific Shipyards Corporation, a delivery order under its Multiple Award Contract in the amount of $5m for the in-drydock repairs and preservation of Caisson #4 at Drydock #2 at Puget Sound Naval Shipyard in Bremerton, Wash. Work will be accomplished by the Todd Pacific workforce and selected subcontractors commencing in August 2006 with completion scheduled for November 2006. The work includes interior and exterior preservation, structural repairs and miscellaneous maintenance items including ballast valve repairs.

21 Sep 2005

Todd Awarded Navy Contract

Todd Shipyards Corporation announced today that the U.S. Navy has awarded to its wholly owned subsidiary, Todd Pacific Shipyards Corporation ("Todd Pacific"), a modification to previously awarded contract N00024-00-C-8514 in support of repairs and alterations performed during the Selected Restricted Availabilities ("SRA's"), the Docking Selected Restricted Availabilities ("DSRA's"), and the Continuous Maintenance Availabilities ("CMA's") of the surface combatants (frigates and destroyers) stationed at Naval Station Everett. This modification extends by approximately five years the Company's Combatant Maintenance Team Contract ("CMT") originally awarded to Todd Pacific by the Navy in 2000. This modification also provides for a cost-plus-award-fee contract.

25 Aug 2005

Todd Shipyards to Overhaul NOAA Vessel

Todd Shipyards Corporation announced that the National Oceanic and Atmospheric Administration (NOAA) has awarded to its wholly owned subsidiary, Todd Pacific Shipyards Corporation, a $13,176,066 contract for the overhaul and conversion of the Ex USNS Capable (T-AGOS 16) which was transferred to NOAA by the United States Navy in September 2004. The overhaul and conversion when completed will allow the Capable to accomplish its new mission of research and deep ocean exploration. The contract period, during which the design, manufacturing, overhaul and conversion will be completed, is from August 2005 through July 2007. Initial design is anticipated to be completed by February 2006, which will coincide with the vessel's arrival at Todd Pacific's Seattle shipyard.

04 Oct 2002

Puget Sound Naval Shipyard Team Leads Successful Availability on Carl Vinson

"Underway, shift colors!" With that phrase, USS Carl Vinson (CVN 70) sailed into the afternoon sun of Puget Sound's Sinclair Inlet, having just completed its third Planned Incremental Availability (PIA) at Puget Sound Naval Shipyard (PSNS). Pacific deployment. installation of SMART Carrier - a 21st century computer system that vastly improves monitoring and control of various systems. In addition, Vinson would receive major improvements to the crew's living quarters, heating steam piping replacement, aircraft repair and maintenance systems capabilities upgrade, catapult and aircraft elevator repair, major weapons elevators modifications, and repairs and modifications to various key systems throughout the ship. States.