Marine Link
Friday, April 19, 2024
SUBSCRIBE

V Henry Island News

23 Jul 2003

News: EBDG-Designed M/V Henry Island Launched

Last April, San Juan Ferry & Barge selected Seattle-based Elliott Bay Design Group (EBDG) to complete the Contract Design for a new landing craft, the M/V Henry island. In order to deliver the vessel in time for the busy summer season, EBDG designed and lofted the landing craft simultaneously, allowing shipyard Latitude Marine Services of La Conner, Wash., to begin cutting steel in December 2002. The 81 ft. steel vessel measures 70-ft. long on deck, with a 25-ft. molded beam, and 7-ft. hull depth. The landing craft is equipped with a ramp forward designed for beach loading and can handle loads up to 90 tons. The vessel is U.S. Coast Guard-inspected to 46 CFR Subchapter I for hull construction and Subchapter T for most systems.

08 Jul 2003

EBDG-Designed M/V HENRY ISLAND Launched

A new vessel is operating on the waters of the Puget Sound. Last April, San Juan Ferry & Barge selected Seattle-based Elliott Bay Design Group (EBDG) to complete the Contract Design for a new landing craft, the M/V HENRY ISLAND. In order to deliver the vessel in time for the busy summer season, EBDG designed and lofted the landing craft simultaneously, allowing shipyard Latitude Marine Services of La Conner Washington to begin cutting steel in December 2002. The 81' foot steel vessel measures 70' length on deck, 25' molded beam, and 7' hull depth. The landing craft is equipped with a ramp forward designed for beach loading and can handle loads up to 90 tons. The vessel is U.S. Coast Guard-inspected to 46 CFR Subchapter I for hull construction and Subchapter T for most systems.