MarineLink News Search
Search term • LPG-Tanker-Repaired,-Modernized-and-Converted
Create an email alert for LPG-Tanker-Repaired,-Modernized-and-Converted
LPG Tanker Repaired, Modernized and Converted
The 977-ft. LPG tanker Matthew was docked on August 17 into dry dock Elbe 17 of Blohm + Voss Repair GmbH to be repaired, modernized and converted in 33 days. The…
Repair Feature: LPG Tanker Repaired, Modernized and Converted
The 977-ft. (297 m) LPG tanker Matthew was docked in mid-August into drydock Elbe 17 of Blohm + Voss Repair GmbH to be repaired, modernized and converted in 33 days.