Marine Link
Thursday, September 29, 2016

General Dynamics NASSCO Starts Construction of Fifth T-AKE Ship

July 21, 2006

General Dynamics (GD) NASSCO, a subsidiary of General Dynamics announced the start of construction on the fifth dry cargo-ammunition ship in the U.S. Navy’s T-AKE program. The ship will be named later and is scheduled to be delivered to the Navy in the first quarter of 2008. NASSCO has been awarded contracts to build nine T-AKE ships. Two additional ships are expected to be ordered by the Navy over the next two years for a total class of 11 ships. The first ship of the class, USNS Lewis and Clark , was delivered to the Navy on June 20. The second ship, USNS Sacagawea , was launched on June 24 and is scheduled to be delivered in the first quarter of 2007. The third ship, USNS Alan Shepard , is scheduled to be launched on December 5, 2006, and delivered in the summer of 2007. The keel laying of the yet-to-be-named fourth ship will take place on July 28, 2006. The T-AKE ships are 689 ft. in length and 105.6 ft. in beam, with a design draft of 29.9 ft. and a displacement of 41,000 metric tons. NASSCO has incorporated international marine technologies and commercial ship-design features into the ships, including an integrated electric-drive propulsion system, to minimize operating costs over their projected 40-year service life.


Maritime Reporter Magazine Cover Sep 2016 - Maritime & Ship Security

Maritime Reporter and Engineering News’ first edition was published in New York City in 1883 and became our flagship publication in 1939. It is the world’s largest audited circulation magazine serving the global maritime industry, delivering more insightful editorial and news to more industry decision makers than any other source.

Subscribe
Maritime Reporter E-News subscription

Maritime Reporter E-News is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for Maritime Reporter E-News