New Power for Alaskan Tug

By Alan Haig-Brown
Friday, August 15, 2014
Norman O (Photo courtesy of Olson Marine)

It has been said that, “There is no reason to design or build an ugly boat.” This is clearly a dictum that those who designed and built the Noman O adhered to. Built in 1970 as the Duncan Foss by the Albina Shipyard under hull number 419, at Portland, Oregon, the tug has a fine shear that sweeps down the 75-foot length from a high sea-going bow to a low fantail that carries most of the boat’s 24-foot midships beam. The classic rounded west coast style wheel house carries aft to a stepped-down galley and still lower fiddly section leaving ample room on the aft deck for a towing winch loaded with 1,600 feet of 1 3/8 tow wire. A flying bridge atop the wheelhouse serves as a functional vantage for making up to tows.

Since being acquired by Olson Marine Inc. of Ketchikan Alaska, the tug, has provided good service to the firm’s five-boat fleet. A black hull and white superstructure with distinctive blue trim shows the excellent level of care that has kept the sound and worthy of a new set of engines to extend her life for several more revenue producing decades.

Owner Rick Olson approached Mike Painter, his local Cummins dealer at South East Diesel & Electric in Ketchikan. The two men worked out a deal to change out the existing older Cat D348s rated at 703 HP each for a pair of modern EPA Tier 3 compliant Cummins QSK19 MCRS engines rated for 750 HP at 1,800 RPM. The electronic controlled engines are built on Cummins’ 19-liter (1,150 cu.in. ) block that in its mechanical KTA19 version has served generations of Alaskan fishermen and mariners. It that has now won wide spread acceptance in Alaska in the electronic QSK19 version.

A project team headed by Jamie Painter and Brian Pinkstaff, also of SE Diesel, was put together with engineer Kevin Johnson and Capt. Brian Ingerham of the Norman O along with Dave Kuehl, Olson’s port engineer. Over a three-month period in early 2014, the team cut, welded, sanded, painted, lifted and aligned to remove the old engines, modify the beds, and then install and align the new engines along with additional refurbishments. When done, the QSK19 engines were delivering 750 HP each at 1800 RPM to ZFW4400 gears turning 70 by 54-inch 5-blade stainless props from Sound Propeller. The engines were fitted with C-Command Engine controls with digital display as well as ECM Data and alarm reporting at each control station. To compensate for the lighter engines the team added 8,000 pounds of concrete ballast.

By the end of April the repowered Norman O was ready to go back into service. Sea trials demonstrated a maximum speed of 12 knots with a 38 GPH fuel burn per engine. At peak torque the tug makes 10.9 knots with a fuel burn of only 18 GPH per engine. The 75-foot tug has a 66-foot loaded waterline and a 19,000-gallon fuel capacity.

Speaking to his decision to have the job done in Ketchikan, Olson Marine owner Rick Olson said, “They have a high density local knowledge of the marine repower work. I have a historical relationship with many of the crew, especially the Painters at Southeast Diesel. This network and trust made the project a success and benefitted the local economy.”


 

  • New Cummins engine inside the Norman O (Photo courtesy of Olson Marine)

    New Cummins engine inside the Norman O (Photo courtesy of Olson Marine)

  • New Cummins engine inside the Norman O (Photo courtesy of Olson Marine)

    New Cummins engine inside the Norman O (Photo courtesy of Olson Marine)

  • Photo courtesy of Olson Marine

    Photo courtesy of Olson Marine

  • Norman O (Photo courtesy of Olson Marine)

    Norman O (Photo courtesy of Olson Marine)

  • New Cummins engine inside the Norman O (Photo courtesy of Olson Marine)
  • New Cummins engine inside the Norman O (Photo courtesy of Olson Marine)
  • Photo courtesy of Olson Marine
  • Norman O (Photo courtesy of Olson Marine)
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

Raytheon Anschütz Opens Service Center in Panama

German navigation system manufacturer Raytheon Anschütz has established its new subsidiary Raytheon Anschuetz Panama, S. de R.L., in Panama City.   The new company,

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

German Shipowner Worst Global Dumper -NSP

German shipowner Ernst Komrowski topped the list of the worst global dumpers with 14 end-of-life vessels sold to the beaches, according to a press release from NGO Ship-breaking Platform (NSP).

Marine Power

Wärtsilä to Power LNG-fueled RoPax Ferry

A ferry being built for Sweden’s Rederi AB Gotland will be fueled by LNG, featuring a Wärtsilä integrated solution which includes a complete LNG powered propulsion- and fuel storage and supply system,

First Container for LNG Hybrid Barge

The HUMMEL (bumblebee) LNG Hybrid Barge will enable Becker Marine Systems to supply low-emission power to cruise ships lying at port in Hamburg. The first container

IntelliJet: Cleantech Propulsion for High Speed Applicatios

IntelliJet Marine, Inc. will present a paper on propulsion and computer simulation for sustainable high speed boats and ships at ASNE Day 2015.   Jeff Jordan

News

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

Kongsberg Expands Louisiana Office, Training Facility

Kongsberg Maritime has purchased approximately 5.2 acres for new construction on an 82,980 sq ft office and training facility. Construction on the James Business

HII Acquires Engineering Solutions Division

Huntington Ingalls Industries (HII) has acquired the Engineering Solutions Division of The Columbia Group, a designer and builder of unmanned underwater vehicles

Marine Equipment

Kongsberg Expands Louisiana Office, Training Facility

Kongsberg Maritime has purchased approximately 5.2 acres for new construction on an 82,980 sq ft office and training facility. Construction on the James Business

Raytheon Anschütz Opens Service Center in Panama

German navigation system manufacturer Raytheon Anschütz has established its new subsidiary Raytheon Anschuetz Panama, S. de R.L., in Panama City.   The new company,

Imabari Bags Order for 11 ULCCs

Imabari Shipbuilding Co., Ltd. (Imabari), with the cooperation of Marubeni Corporation, has secured newbuilding order for eleven (11) units of 20,000TEU Ultra-Large Container Carriers,

Vessels

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

NASSCO to Christen Third MLP, Lewis B. Puller

Shipbuilder General Dynamics National Steel & Shipbuilding Co. – NASSCO – will christen the USNS Lewis B. Puller (MLP 3 AFSB) Saturday, February 7, 2015 in San Diego.

New Survey Vessel Ordered for the Port of London

The Port of London Authority (PLA) has ordered a new purpose-built survey catamaran, a CTruk MPC19, due to enter service on the river Thames later this year.   The

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Navigation Pod Propulsion Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.8351 sec (1 req/sec)