18 New Vessels for SMIT

Friday, March 31, 2006
SMIT has reached an agreement with Damen Shipyards from the Netherlands for constructing 11 newly built vessels. Two of these vessels (type ASD 3211, 65 tons bp) have been awarded with a long-term contract for the Terminals Division in Equatorial Guinea and will be delivered in respectively September and December 2007. Four vessels (type ASD 2810) are replacements for the Harbor Towage fleet in Rotterdam. These vessels will be equipped with a substantially higher bollard pull (60 tons bp). Two of these vessels will be delivered in respectively 2007 and 2008. An additional five vessels of the ASD 2810 type (60 tons bp) will be deployed as replacement for and expansion of the divisions’ worldwide fleet. Two vessels will be delivered in 2007 and three in 2008. Also SMIT has reached an agreement for the purchase of 7 newly built work vessels from Hadi H. Al-Hammam Est. of Saudi Arabia. These vessels of approximately 75 tons bp are a modified version of the Smit Kamara and Smit Komodo. The first two vessels of this new series will be delivered during this year and the last one is expected to be delivered in 2008. They will be managed by the SMIT Singapore organization. This investment comprises both replacement as well as expansion. Three of these vessels have already been awarded with long-term contracts for the oil and gas sector to work for Saudi Aramco in Saudi waters through Hadi H. Al-Hammam Est. Both Hadi H.Al-Hammam Est. and SMIT have declared their intent to jointly pursue additional opportunities in Saudi Arabia.
Email AddThis Feed Button Share
Maritime Reporter May 2012 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Singapore's Second Cruise Terminal Set to Welcome First Ship

Later this month Singapore's new cruise ship passenger terminal will see its first ship arrive The 28,000-square-meter terminal, which was built at a cost of

Cruise Ship Returns to Erie Canal

Grande Mariner was Stranded on Canal System During 2011 Flooding. The M/V Grande Mariner, a 96-passenger cruise ship that was stranded for more than two months because of flooding in 2011,

Holland America Line Wins USCG Eco Award

Holland America Line receives second Benkert Award for its marine environmental initiatives as U.S. Coast Guard award recognizes line's fleetwide efforts  At a recent ceremony,

Vessels

Spanish Shipyard Launches Grampian Defiance

The last in the series of new D class Emergency Response and Rescue Vessels (ERRVs), commissioned by Craig Group in a $55m investment programme, has been launched.

Maersk Container Ship Thwarts Pirate Attack in Gulf of Oman

An onboard security team repelled an attack by pirates in several boats who fired at 'Maersk Texas' north-east of Fujairah The US flag vessel Maersk Texas thwarted

Fire Aboard Submarine in U.S. Shipyard

Fire fighters battle a blaze in the nuclear submarine 'USS Miami' in the US Navy shipyard in Maine According ot CNN the fire was not out six hours after the initial response,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Winch
mobi | rss feeds | archive | history | articles | privacy | contributors | top news | about us | copyright

Time taken: 0.0300 sec (33 req/sec)