GlobalSantaFe Rigs Appear OK

Tuesday, August 30, 2005
GlobalSantaFe Corporation reported that it has accounted for all five of its drilling rigs that were in the direct path of Hurricane Katrina. All personnel on the five rigs were safely evacuated prior to the storm's arrival. GlobalSantaFe rigs in the path of Hurricane Katrina included the GSF Development Driller II and GSF High Island VIII, which showed no signs of damage during a preliminary aerial inspection. The GSF Celtic Sea and GSF Development Driller I were listing slightly, and crews and equipment are arriving on location today to assess the condition of the rigs. The GSF Arctic I drifted off its original location and was grounded in shallow waters near the mouth of the Mississippi River. Marine surveyors will be dispatched to determine the condition of the rig.

GlobalSantaFe evacuated 972 personnel after suspending operations on 14 rigs in the Gulf of Mexico due to Hurricane Katrina, including eight jackup rigs that were outside the direct path of the storm and the GSF C.R. Luigs drillship, which was moved from Katrina's path in advance of the storm. "Our top priority was to ensure the safety of everyone aboard our vessels, and we're grateful that our personnel were able to secure and safely evacuate our rigs with no injuries or environmental impact," said GlobalSantaFe President and CEO Jon Marshall. "We remain deeply concerned for the well- being of our off-duty personnel and for the families and friends of our co- workers adversely affected by the hurricane."

The company began re-manning its rigs this morning to assess their conditions and will provide an update when more information becomes available.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Conrad Shipyard Forms LNG Business Unit

Conrad Shipyard has formed a new business unit focused on LNG projects.   Conrad, builder of North America’s first LNG bunker barge scheduled for 2017 delivery,

Prince Charles Places Final Section of UK Aircraft Carrier

The second of the largest warships ever built for the U.K. Royal Navy, the Queen Elizabeth Class carrier HMS Prince of Wales, was given the royal seal of approval when HRH The Prince of Wales,

New Zealand: Maritime Trade is Key

Globally, shipping is on the rise – already 80-90 percent of the world’s trade is by ship; that is more than 12 billion metric tons of goods annually, shipped by 1.

Offshore

US Oil Drillers Cut Rigs after 3 Weeks of Additions

U.S. oil drillers cut rigs this week for a 20th week this year after three weeks of additions, according to a closely followed report on Friday, as crude prices

Subsea 7 Announces PLSV Swap off Brazil

Subsea 7 S.A. said it has reached an agreement with Petrobras to substitute a pipelay support vessel (PLSV) working off Brazil.   The agreement will see the Subsea-7-owned

FPSOs Sit Unprecedentedly Idle

While the oil and gas markets are starting to come to life, nearing the $50 per barrel mark, the future fate of floating production remains a mystery   The 20

 
 
Maritime Security Navigation Offshore Oil Pipelines Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0821 sec (12 req/sec)