Blount-Barker Signs Contract For Sea Wolf Marine Tug

Wednesday, August 22, 2001
This past August, Blount-Barker Shipbuilding signed a contract with Sea Wolf Marine of Bayonne, N.J. to build a 2,400-hp, 85-ft. (25.9 m) double chine, all welded twin-screw tug set for delivery in April 2002.

Bristol Harbor Group has been contracted to modify the Blount classic 85-ft. (25.9-m) tug design to take advantage of CNC (computerized numeric controlled) cutting.

The tug will be powered by two CAT 3512 engines; 4:1 twin gears and two 65kW generators will supply ship service power. Keel cooled and equipped with two, four-blade stainless steel propellers measuring 70-78-in. in diameter, the tug will be used for marine towing along the inland and intracoastal waterways on the East Coast.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

OSI to Integrate Software for UK Royal Navy

OSI Maritime Systems (OSI) announced the signing of a contract to integrate its flagship software, ECPINS-W Sub, into the U.K. Royal Navy’s T45 Destroyer Integrated Bridge System (IBS).

HHI to Deploy 3DEXPERIENCE Design Platform

Hyundai Heavy Industries Selects Marine & Offshore Industry Solution Experiences for Design and Engineering of Offshore Structures Dassault Systèmes, the 3DEXPERIENCE Company,

Canadian Icebreaker Refit Contracts Awarded

The Canadian Government informs it has awarded a $6.5 million contract to Babcock Canada Inc. for critical refit work for Canadian Coast Guard ship 'CCGS Louis S.

Offshore

Coast Guard groundbreaking ceremony recogizes new support facility

Representatives from the 14th Coast Guard District, Coast Guard Base Honolulu and Mortenson Federal Contracting Group participated in a groundbreaking ceremony

Diamond Offshore Shares on the Rise

Diamond Offshore Drilling Inc, one of the world's top five offshore rig contractors, reported a better-than-expected quarterly profit as it cut drilling costs and hiked prices,

Offshore O&G: Cuts, Delays in Norway as Costs Soar

More oil and gas projects in Norway could be put on hold because of rising costs, adding to a growing list of developments that have been delayed or called off,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pod Propulsion Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1060 sec (9 req/sec)