Despite Crunch on Funds, U.S. Navy Sticks To Building Plan

Friday, July 13, 2001
The top U.S. Navy officer said Thursday he would recommend the service stick to its plan to build a multi-billion-dollar class of new destroyers despite a crunch on funds for new warships.

"I'd love to have DD-21," Admiral Vernon Clark, the chief of naval operations, said, referring to the Zumwalt- class destroyer designed chiefly to support Marines ashore with long-range firepower. He called the program "central to our transformation effort" for the 21st century.

The DD-21 is one of the biggest U.S. arms programs apparently in danger of being killed in Defense Department strategy reviews under way.

On May 31, the Navy announced it was delaying the selection of a team to build as many as 32 of the ships at a combined value of up to $30 billion pending the outcome of the studies.

The rival teams - headed by General Dynamics Corp.'s Bath Iron Works Shipyard and Lockheed Martin Corp. on the one hand and by Litton Industries' Ingalls shipyard division and Raytheon Co. on the other - had been scheduled to make their "best and final" contract proposals to the Navy in early June.

The program's prospects have been further clouded by Air Force Gen. James McCarthy, who headed a panel on "transformation" for Defense Secretary Donald Rumsfeld.

McCarthy last month said that both the DD-21 and the experimental CVN(X) aircraft carrier were absent from his panel's report because, "We were not persuaded they were truly transformational." Clark spelled out his recommendation to build the new destroyer during a break in his testimony to the House Armed Services Committee. He was discussing the Navy's $99 billion amended budget request for fiscal 2002, which starts Oct. 1. The budget provides for six new ships and 88 naval aircraft next year, three fewer than needed to sustain the approximately 316-ship Navy recommended in the 1997 congressionally mandated Quadrennial Defense Review, the most recent such blueprint.

The budget also provides continued research and development funds for the DD-21, which features electric-drive engines, reduced manning concepts, advanced radar technology and a powerful new gun.

At current funding levels, the Navy would shrink to 230 ships over time, not enough to cover the force projection requirements of the United States for the foreseeable future, Clark said. Low orders were also undercutting the defense industrial base.

"We are paying a premium in program cost today and realizing substantial cost growth because of production inefficiencies due to the lack of economies of scale," he said, calling for "level funding" for procurement that would let the Navy work more closely with the shipbuilding industry.

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

Egypt Gets FSRU from BW Gas

Norway-based BW Gas will provide Egypt with a liquefied natural gas (LNG) floating import terminal under a five-year contract.   This comes as as the North African

Australian PM Promises 2500 Shipbuilding Jobs

Up to 2,500 shipbuilding jobs in Adelaide will be safe for "all time", the Prime Minister says, ahead of the expected announcement to build a new fleet of Navy ships worth $39 billion, reports ABC.

DP World Sings Melbourne Port Lease Deal

DP World and the Port of Melbourne Corporation have reached an agreement on a new 50-year lease, ending months of negotiation over rental increases at Australia’s biggest port.

 
 
Maritime Contracts Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1329 sec (8 req/sec)