United Defense Wins Contracts

Wednesday, October 02, 2002
United Defense, Industries, Inc announced today the award to NORSHIPCO a division of United States Marine Repair of 2 multi-year, multi-ship, cost plus contracts by the U.S. Navy’s Supervisor of Shipbuilding and Repair (SUPSHIP), Portsmouth worth nearly $90 million if all options are exercised. The largest contract, for six LSD-41 and 48 class ships, puts the entire LSD fleet of this ship type on East and West coasts under maintenance contracts with United States Marine Repair, a subsidiary of United Defense. The Advance Planning award totals $52,610. The combined total contract award, if the Navy exercises all options, is approximately $64 million. The ships included in this award, all home-ported in Norfolk, are the USS OAK HILL, USS WHIDBEY ISLAND, USS GUNSTON HALL, USS ASHLAND, USS TORTUGA, and the USS CARTER HALL. The work package includes pier side and dry dock work, ship alterations, hull, mechanical and electrical repairs, modernization and habitability work and required emergent repairs. According to Tom Epley, NORSHIPCO's president and general manager, "Being awarded this long-term contract gives NORSHIPCO a greater ability to stabilize our work force and avoid the employment swings we often encounter under the fixed-price, single availability method of contracting." Epley indicated that the Navy is returning to multi-ship, multi-year cost contracting to decrease the amount of time its ships spend in repair availabilities and to increase contractor efficiency. "With this award,” said Epley, “our workers will know the ships and their systems, as well as the assigned sailors. This should result in lower costs and more time available for training, benefiting both the Navy and the company from this long-term relationship." Another contract awarded to NORSHIPCO by SUPSHIP, Portsmouth, is the Docking Phased Maintenance, Fixed Price Availability for the USS SEATTLE (AOE-3), a Norfolk-based, fast combat support ship. The initial award for advance planning is valued at $1.4 million. If the Navy exercises the contract options, the total award value will exceed $25 million. The USS SEATTLE is scheduled to arrive at NORSHIPCO on October 15, 2002. The work package includes dry docking, structural repairs, piping, machinery and electrical repairs and interior preservation work. Approximately 250 NORSHIPCO workers per day will be assigned to the ship.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

IMO Calls for Environmentally Sound Ship Recycling in Bangladesh

The  International Maritime Organization (IMO) and the government of the People’s Republic of Bangladesh are jointly implementing a project entitled “Safe and

EUROPA 2 Undergoes First Scheduled Docking

As part of its first scheduled docking, Hapag-Lloyd Cruises’ EUROPA 2 underwent technical maintenance at Blohm + Voss in Hamburg from April 11-24, 2015.   At the same time,

The German Shipbuilding Rebound

German shipbuilding has made a significant turnaround. The country’s shipbuilding industry has seen increases in the number of employees, orders and deliveries compared to 2013,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Pipelines Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1306 sec (8 req/sec)