Eirik Raude Leaves Yard For Sea Trials

Monday, September 09, 2002
Ocean Rig’s second semi-submersible drilling rig, Eirik Raude, left the Irving Shipyard in Halifax this morning local time to commence a four week period of sea trials. The rig will first undergo inclination testing followed by thruster and various system tests. These will be performed in sheltered waters. Eirik Raude will thereafter move offshore for the remainder of the testing program, which will be carried out close to the rig's first drilling location in deep water outside Nova Scotia. Ocean Rig expects that Eirik Raude will complete the sea trials and start operations under the EnCana drilling contract primo October this year.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Bureau Veritas to Class, Certify FPSOs for Saipem

Bureau Veritas has been awarded a contract by Saipem to provide classification and certification services for the two Kaombo FPSOs for service off Angola. The

Kvaerner in Statoil Unmanned Platform Project

Kvaerner say that Statoil has awarded it a concept study related to a standardised, unmanned dry tree wellhead platform for the Oseberg Future Development project.

Scotland Site for World's Biggest Tidal Array

The world’s biggest tidal array is to be built in North Scotland bringing jobs and energy security to the Pentland Firth region, informs a UK Government news release.

Tanker Trends

W.Africa Crude Slow to Trade; Nigerian Glut Fading

Angolan cargoes for October loading are so far finding buyers slowly, traders said on Friday, while there were further signs that an overhang of September-loading Nigerian cargoes is being absorbed.

WTO Rules Against Argentina Licensing Rules in Row with US, EU, Japan

A World Trade Organization (WTO) dispute panel ruled against Argentina on Friday in a 2012 case brought by the United States, European Union, and Japan against

Odfjell 2Q Results In Line with Expectations

Chemical Tankers had an EBITDA of $24 million, compared with $17 million in the first quarter. Improved utilization with only minor interruptions of trade. Time-charter results were up by 10%.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Port Authority Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1930 sec (5 req/sec)