Eirik Raude Leaves Yard For Sea Trials

Monday, September 09, 2002
Ocean Rig’s second semi-submersible drilling rig, Eirik Raude, left the Irving Shipyard in Halifax this morning local time to commence a four week period of sea trials. The rig will first undergo inclination testing followed by thruster and various system tests. These will be performed in sheltered waters. Eirik Raude will thereafter move offshore for the remainder of the testing program, which will be carried out close to the rig's first drilling location in deep water outside Nova Scotia. Ocean Rig expects that Eirik Raude will complete the sea trials and start operations under the EnCana drilling contract primo October this year.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Japan, U.S. Look to Expand Naval Cooperation

Japanese Prime Minister Shinzo Abe's push to allow Tokyo to come to the aid of an ally under attack will pave the way for closer cooperation between U.S. and Japanese forces across Asia, a top U.

BP Terminates GoM Rig Contracts

BP terminated contracts for two deepwater oil drilling rigs in the Gulf of Mexico as the British oil company slashes its exploration budget due to fallen oil prices.

MacGregor Appoints Høyesen as VP

MacGregor reorganized into seven operative divisions in the beginning of 2015 to improve customer focus.   Offshore Mooring and Loading Division drives the development

Tanker Trends

DryShips to Sell its Suezmax Tanker Fleet

DryShips Inc. (NASDAQ: DRYS), has announced  that it has entered into firm sales agreements with entities controlled by the Company's Chairman and Chief Executive Officer,

India Halts Iran oil Imports Under U.S. Pressure

Oil imports from Iran at 220,000 bpd in year to March 31. U.S. pressured India not to raise annual Iran oil imports. India halted oil imports from Iran for the

SCI takes Delivery of VLCC "Desh Vibhor"

The Shipping Corporation of India Ltd. (SCI) accepted delivery of a Very Large Crude Oil Carrier (VLCC) on 28 March, 2015. The vessel has been named “Desh Vibhor”.

 
 
Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Port Authority Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0981 sec (10 req/sec)