Husky Energy Awards $250 M Contract For White Rose

Wednesday, September 04, 2002
Husky Energy Inc. has awarded a $250 million contract for the subsea production system for the White Rose oil field project, located 217 miles off the east coast of Newfoundland and Labrador. The contract covers the design, supply and installation of the subsea system for the White Rose project. Husky plans to use a floating production, storage and offloading (FPSO) vessel to develop the offshore field. The subsea production system includes a total of 42 kilometres of flexible risers, flowlines and umbilicals, five subsea manifolds, up to 21 Christmas trees and wellheads distributed across three Glory Hole sites. Glory Holes are depressions in the ocean floor excavated to provide protection for the subsea production equipment. The contract has been awarded to Technip CSO Canada Ltd., which is a Newfoundland-based affiliate of Paris-based Technip-Coflexip. The contract also contains an option for Technip CSO Canada to carry out the installation of the mooring system for the White Rose FPSO. "The White Rose project will benefit Newfoundland and Labrador, and the offshore oil industry," said Mr. John C.S. Lau, President and Chief Executive Officer of Husky Energy. "This contract is a key part of the total White Rose project development."
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Hess Selects BMT for Stampede Marine Monitoring System

BMT Scientific Marine Services (BMT), an international maritime design, engineering and risk management consultancy, has been selected by Hess Corporation to

FSL Trust Signs Charter Agreement with US Oil Company

FSL Trust Management Pte. Ltd. (FSLTM), as trustee-manager of First Ship Lease Trust, has entered into a two-year time charter agreement with a prominent US

U.S. DoI Upholds 2008 Shell Arctic Lease

The U.S. Interior Department on Tuesday upheld a 2008 lease sale in the Chukchi Sea off Alaska, moving Royal Dutch Shell a step closer to returning to oil and gas

Ports

Bulk Carrier Runs Aground in Delaware River (Link to Video)

Coast Guard Sector Delaware Bay is investigating a ship aground in the Delaware River near the Burlington Bristol Bridge, which connects Burlington, NJ and Bristol Township, PA.

Tanker Backlog Builds at Basra

Ships face up to a three week wait; bad weather in February delayed loading, created backlog. * April intake to be reduced to clear backlog By Keith Wallis SINGAPORE,

U.S. Port Delay Boost February Air Freight

Global air freight volumes rose 11.7 percent year-on-year in February, driven by the Chinese New Year, the International Air Transport Association said on Wednesday.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1418 sec (7 req/sec)