TEN Accepts Delivery of Nine-Vessel Western Petroleum Fleet

Wednesday, May 10, 2006
Tsakos Energy Navigation Limited (TEN) announced the completion of delivery of three LR Aframax newbuilding contracts and six 2005-built MR handymax tankers all with 1A ice-class designations and capable of carrying petroleum products. The first vessel, the Artemis, was delivered on April 11, 2006 while the remaining eight vessels and contracts were delivered in the course of the following four weeks. Of the six MR tankers delivered four will operate in extended time-charters while two will enter the spot market.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

 
 
Maritime Contracts Naval Architecture Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0705 sec (14 req/sec)