Cruise Ship Freed From Sandbar

Thursday, June 08, 2006
According to reports, the cruise ship Norwegian Crown, with 1,104 passengers aboard, ran aground just off Bermuda on June 7, and after remaining stuck on a sandbar through the day, was pulled off by tugs during the evening high tide. The cruise ship's passengers and crew were at no time in any danger, according to Norwegian Cruise Lines, which said the ship tendered passengers ashore to Hamilton for local excursions. The 34,000-ton ship ran aground at about at the top of Dundonald Channel as it sailed from St. George's, Bermuda, to Hamilton in heavy rain. Three tugboats tried to set the Norwegian Crown free, and eventually postponed efforts due to high tide.

After it was pulled free, the ship headed for Dockyard, skipping Hamilton as a port of call. Source: Cruise Ship Report

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Mitsubishi Exits Cruise Business; Books $357m Loss

Mitsubishi Heavy Industries, Ltd. (MHI) announced its decision to book an extraordinary loss from its cruise ship business in the company's consolidated financial

Partnerships Key to Caribbean Maritime Security

Planning and execution of port and maritime safety and security in Caribbean region is all about partnerships Maritime security and safety experts are meeting in Nassau,

Eurodam Tops in USPH Inspections

Holland America Line’s ms Eurodam achieved a perfect score of 100 on a recent routine United States Public Health (USPH) inspection conducted by the U.S. Centers for Disease Control and Prevention.

Navy

Italy Ending Med Sea Rescues

Rights groups warn of risk of more deaths; EU mission Triton will have more limited scope. Italy said on Friday it would close a sea rescue mission that has saved the lives of more than 100,

Libyan Government: Ports, Oil Fields Safe

Libyan oil ports and fields are safe and under government control, the country's interior minister said on Friday after visting the eastern Brega port. "This

Keel Laid, Fabrication Started on 2 Navy Warships

This week, General Dynamics Bath Iron Works celebrated two milestone events for the Arleigh Burke-class program. On October 30, Bath Iron Works held a keel laying

 
 
Maritime Security Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1702 sec (6 req/sec)