Coast Guard Icebreaker Back in Seattle

Wednesday, March 29, 2006
The Coast Guard icebreaker Polar Star returned home to Elliott Bay a day ahead of schedule Tuesday afternoon after a successful voyage to Antarctica to help break a supply channel for U.S. science stations. The 399-ft. long, Seattle-based cutter and its 134-member crew, commanded by Capt. Bruce Toney who usually commands its twin, Polar Sea, scrambled on less than 48-hours notice to leave on Jan. 20 from Pier 36, home of the nation's polar icebreaking fleet. A Russian icebreaker, the Krasin, that the National Science Foundation this year chose to open a channel to supply science stations was confronted by more difficult conditions than expected and slowed by propeller damage. While traditional ice channels have been 12 to 14 miles long, ice this year extended more than 70 miles from McMurdo Station, but less than the record 84 miles last year. As the austral summer window to deliver supplies waned, thePolar Star, veteran of 15 such missions in its 30 year life, sped to backup the Krasin, entering Antarctica's iceberg-choked waters Feb. 13. Source: Seattlepi

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

Migrants Survivors Tell of Struggle at Sea

The bodies of 21 women and one man were brought ashore to Sicily on Friday as fellow migrants described scenes of panic and violence when water poured into their dinghy.

Rescuers Recover 17 bodies, pick up 1,128 Migrants

An Irish navy ship recovered 17 dead bodies on Thursday when it went to the aid of migrants packed onto a wooden boat off the coast of Libya, Italy's coastguard said,

Turkey Scrambles Fighter Jets in Search of Missing Vessels

Turkish F-16 fighter jets scrambled on Wednesday to check reports that missing Turkish coastguard vessels had appeared in Greek waters in the Aegean Sea, Turkish military sources said.

Vessels

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

Live Fish Carrier Launched at Gondan

At high tide, the vessel “MARTIN SÆLE”, the first Live Fish Carrier built by Gondan Shipyard in Figueras, was successfully launched today. Representatives of the owner of the vessel,

GTT Cuts Outlook on Ship Construction Delays

French supplier of systems for marine transportation of liquified natural gas (LNG) Gaztransport & Technigaz (GTT) reported strong growth in its first half results

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0694 sec (14 req/sec)