North Carolina Sub Pressure Hull Completed

Friday, September 01, 2006
The Virginia Class North Carolina (SSN 777) on August 31 saw the completion of its pressure hull. This marked the completion of final welds that join sections of the cigar-shaped hull into a single unit that protects the crew and equipment from sea pressure. General Dynamic’s Electric Boat (GDEB) and Northrop Grumman Newport News (NGNN) jointly build Virginia Class submarines. Each shipbuilder constructs sections of the ship, while final assembly, outfitting, test and delivery are alternated between them. GDEB has already delivered USS Virginia (SSN 774) under the co-production arrangement and will deliver Hawaii (SSN 776) this coming winter. NGNN delivered Texas in June 2006 and is scheduled to deliver North Carolina in the spring of 2008 when it will become the fourth submarine of the Virginia Class to join the fleet. The Navy has six other Virginia Class submarines under contract, and all are in various phases of construction. The Navy plans to build a total of 30 Virginia Class attack submarines to replace the aging Los Angeles Class submarines.
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

USS Montpelier Modernization Contract for General Dynamics

The U.S. Navy has awarded General Dynamics Electric Boat a $46.4 million contract for planning efforts in support of maintenance and modernization work on USS Montpelier,

Adm. Swift Takes Command of Pacific Fleet

Adm. Scott H. Swift returned to his home state and relieved Adm. Harry B. Harris Jr. as commander of the U.S. Pacific Fleet during a change of command ceremony on Joint Base Pearl Harbor-Hickam,

Germany Looking to Dock Submarine Deal with India

The German Defense Minister Ursula von der Leyen is visiting India lobbying for the purchase of German Stealth Submarines and European military hardware, say local media.

Fuels & Lubes

Crowley’s 2nd LNG ConRo Ship Ahead of Schedule

Shipbuilder VT Halter Marine, Inc. announced construction has started early for the second liquefied natural gas (LNG)-powered ConRo ship, Taíno, for Crowley Holdings, Inc.

Overnight Cruise Ship Visits Suspended in White Bay

The New South Wales (NSW) Port Authority has suspended all overnight cruise ship visits to White Bay until the NSW Environment Protection Authority (EPA) has regulated

Fluxys LNG Launches Zeebrugge Capacity Consultation

Belgian gas infrastructure operator Fluxys said on Thursday it was launching a market consultation to assess demand for additional capacity at the Zeebrugge liquefied natural gas terminal in Belgium.

 
 
Maritime Contracts Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1095 sec (9 req/sec)