Kleven Maritime to Build Six for Siem

Wednesday, October 25, 2006
Norwegian shipbuilding group Kleven Maritime AS won a $477m contract to build six ships for Siem Offshore, the companies announced. Kleven said the contract shared by its two western Norway yards was the largest in its history. The shipyards will deliver six, 292-ft. anchor handling tugboats during 2009 and 2010, with an option for six more in 2010. The ships will be capable of anchor handling as well as construction work for the offshore oil industry. Source: AP

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter June 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

ABP orders Two Gottwald cranes

Terex Port Solutions (TPS) has received an order from Associated British Ports (ABP) for two electric Terex Gottwald Model 8 portal harbour cranes in the G HSK 8424 B four-rope grab variant.

Berthing Policy for Dry Bulk Cargo for Indian Ports Unveiled

Ministry of Shipping has formulated a new Berthing Policy for Dry Bulk Cargo for all Major Ports which will come into effect from 20th August, 2016. The objective

World Trade Routes Won't be the Same with Expanded Panama Canal!

On 26th June 2016, a landmark development for the shipping industry will occur with the opening of the new third set of locks at the Panama Canal. Clarksons Research takes a look.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0671 sec (15 req/sec)