Aker Kvaerner Wins Subsea Contract

Thursday, May 10, 2007
Aker Kvaerner signed a letter of intent with Aker Floating Production in January 2007 and has now signed the final contract to deliver a complete subsea production system to Reliance Industries in India. The value of Aker Kvaerner's contract is in excess of $300m. The subsea production system will be installed at 1100-1400 meters water depth and includes trees, manifolds, controls, umbilicals, flowlines and risers. The contract will be booked as order intake in the second quarter of 2007.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Star Bulk Takes Delivery of First Capesize from JMU

Athens, Greece-headquartered Star Bulk Carriers says it has taken delivery of 'M/V Peloreus' a 182,000 dwt Capesize built by Japan Marine United (“JMU”) and the

Ardmore Shipping Secures Newbuilding Finance

Ardmore Shipping Corporation says it has signed agreements to upsize its existing senior loan facility with ABN AMRO Bank N.V., Nordea Bank Finland Plc, and Skandinaviska Enskilda Banken AB ("SEB").

Gulf Island Fab Sign Bechtel Offshore Cooperation Agreement

Gulf Island Fabrication, Inc. says it has signed a cooperative agreement with Bechtel Oil, Gas, and Chemicals, Inc. to work together to pursue opportunities for offshore projects for the U.

Passenger Vessels

Cause of S.Korea Ferry Businessman's Death Remains Unknown

Yoo's body too badly decomposed to determine cause of death; mystery surrounding final days of de-factor owner of doomed ferry deepens. Yoo's son arrested in latest capture of family members.

Maritime Reporter @ 75: The Daily Cartoon

Maritime Reporter & Engineering News was founded by John J. O'Malley (1905-1980) in 1939, and today ranks as the world's largest audited trade publication in the world serving the maritime industry,

Concordia Tow Update: Smooth Sailing

The Costa Concordia wreck removal team reported this morning at 10:30 a.m. that after 22 hours of navigation, the convoy was over 50 miles off Giglio Island with about 140 miles from Genoa Prà-Voltri.

 
 
Maritime Careers / Shipboard Positions Maritime Security Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0953 sec (10 req/sec)