BAE Wins Overhaul Contract

Friday, July 06, 2007
BAE Systems won a contract by the U.S. Navy's Military Sealift Fleet Support Command for a 60-day overhaul of the fast combat support ship USNS Arctic (T-AOE 8). The contract includes options which, if exercised, would bring the cumulative value of the work package to $7.9 million. All work on the Military Sealift Command ship will be performed at BAE Systems Norfolk Ship Repair starting in July and is expected to be completed in September 2007.

USNS Arctic's primary mission is to rapidly replenish Navy task forces and carry more than 177,000 barrels of oil; 2,150 tons of ammunition; 500 tons of dry stores; and 250 tons of refrigerated stores. The ship receives petroleum products, ammunition and stores from shuttle ships and redistributes these items simultaneously to carrier strike group ships.

"This award comes on the heels of our drydocking Military Sealift Command's cargo transport ship, USNS Brittin," said Al Krekich, president, BAE Systems Ship Repair. "It allows BAE Systems to play an even greater role in ensuring the nation's important logistics ships are ready to conduct their missions at a moment's notice."

BAE Systems' work on the Arctic includes drydocking the ship; cleaning and painting the underwater hull and freeboard area; opening, cleaning, gas freeing and testing tanks; overhauling sea valves; and accomplishing various electrical, communication and navigation equipment repairs, along with U.S. Coast Guard inspection items, machinery inspections and repairs and underway replenishment equipment repairs.

BAE Systems Ship Repair is the United States' leading non-nuclear ship repair, modernization and conversion company - focused on dry dock and ship repair services for the U.S. Navy, other defense agencies and commercial customers. It has major operations in Norfolk, San Diego, San Francisco and Hawaii.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

Environmental

Liebherr to Deliver RTGs to Mayotte and Manila

Liebherr confirms orders for variable speed RTGs and electric RTGs. DPWorld Asian Terminals Inc. has placed an order with Liebherr Container Cranes for a further 5 RTGs at its Manila facility.

Ecoships Claims 15% Ship Efficiency Gain

Ecoships introduced a customized version of the Six Sigma DMAIC approach to process and performance evaluation in order to optimize the energy-efficiency of the vessels under its management.

IBIA Welcomes MEPC Bunker Compromise

The compromise solution on the issue of ensuring bunker quality agreed at the 67th meeting of the IMO’s Marine Environment Protection Committee (MEPC 67) has been

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Pipelines Port Authority Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1574 sec (6 req/sec)